Code |
Cours Name |
Start |
End |
City |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-04-21 |
2024-04-25 |
DUBAI |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-04-21 |
2024-04-25 |
Casablanca |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-04-21 |
2024-04-25 |
Doha |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-04-21 |
2024-04-25 |
Cairo |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-04-21 |
2024-04-25 |
Marrakesh |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-04-21 |
2024-04-25 |
Sharm ElShaikh |
644 |
Safe Isolation of Plant and Equipment |
2024-04-21 |
2024-04-25 |
Jeddah |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-04-21 |
2024-04-25 |
Muscat |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-04-21 |
2024-04-25 |
Manama |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-04-21 |
2024-05-02 |
Amman |
567 |
Process Engineering Essentials |
2024-04-21 |
2024-04-25 |
Riyadh |
511 |
Process & Mechanical Engineering Essentials |
2024-04-21 |
2024-05-02 |
Tunisia |
737 |
ISO 17025 Laboratory Quality Management |
2024-04-21 |
2024-04-25 |
Kuwait |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-04-21 |
2024-04-25 |
DUBAI |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-04-22 |
2024-04-26 |
Jakarta |
345 |
Production Chemistry – OGPC |
2024-04-22 |
2024-04-26 |
London |
641 |
Process Equipment & Piping Systems |
2024-04-22 |
2024-04-26 |
Istanbul |
488 |
Shutdowns, Turnarounds and Outages |
2024-04-22 |
2024-04-26 |
Rome |
547 |
Servo Motor Technology |
2024-04-22 |
2024-04-26 |
Kuala Lumpur |
486 |
Process Plant Start_up and Commissioning |
2024-04-22 |
2024-04-26 |
Prague |
119 |
Fundamentals of Mechanical Technology |
2024-04-22 |
2024-04-26 |
Zurich |
135 |
Fundamentals of Chemical Engineering |
2024-04-22 |
2024-04-26 |
Amsterdam |
541 |
Root Cause Failure Analysis |
2024-04-22 |
2024-04-26 |
Madrid |
125 |
Mechanical Equipment |
2024-04-22 |
2024-04-26 |
Trabzon |
139 |
Fluid Flow Control in the Process Industry |
2024-04-22 |
2024-04-26 |
Toronto |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-04-22 |
2024-04-26 |
Munich |
142 |
Welding Technology |
2024-04-22 |
2024-04-26 |
Barcelona |
364 |
Flow Measurement and Custody Transfer |
2024-04-22 |
2024-04-26 |
Vienna |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-04-22 |
2024-04-26 |
Bangkok |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-04-22 |
2024-04-26 |
Marbella |
361 |
Advanced Vibration Analysis |
2024-04-22 |
2024-04-26 |
Geneva |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-04-22 |
2024-04-26 |
Paris |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-04-22 |
2024-04-26 |
Beijing |
641 |
Process Equipment & Piping Systems |
2024-04-28 |
2024-05-02 |
Jeddah |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-04-28 |
2024-05-02 |
Tunisia |
547 |
Servo Motor Technology |
2024-04-28 |
2024-05-02 |
Amman |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-04-28 |
2024-05-02 |
Doha |
541 |
Root Cause Failure Analysis |
2024-04-28 |
2024-05-02 |
DUBAI |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-04-28 |
2024-05-09 |
Marrakesh |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-04-28 |
2024-05-02 |
Riyadh |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-04-28 |
2024-05-02 |
Casablanca |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-04-28 |
2024-05-02 |
Sharm ElShaikh |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-04-28 |
2024-05-02 |
Muscat |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-04-28 |
2024-05-02 |
Beirut |
345 |
Production Chemistry – OGPC |
2024-04-28 |
2024-05-02 |
Cairo |
644 |
Safe Isolation of Plant and Equipment |
2024-04-28 |
2024-05-02 |
Manama |
737 |
ISO 17025 Laboratory Quality Management |
2024-04-28 |
2024-05-02 |
DUBAI |
793 |
Chemical Handling Awareness |
2024-04-28 |
2024-05-02 |
Manama |
142 |
Welding Technology |
2024-04-29 |
2024-05-03 |
London |
488 |
Shutdowns, Turnarounds and Outages |
2024-04-29 |
2024-05-03 |
Jakarta |
125 |
Mechanical Equipment |
2024-04-29 |
2024-05-03 |
Beijing |
567 |
Process Engineering Essentials |
2024-04-29 |
2024-05-03 |
Istanbul |
486 |
Process Plant Start_up and Commissioning |
2024-04-29 |
2024-05-03 |
Rome |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-04-29 |
2024-05-03 |
Kuala Lumpur |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-04-29 |
2024-05-03 |
Prague |
119 |
Fundamentals of Mechanical Technology |
2024-04-29 |
2024-05-03 |
Trabzon |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-04-29 |
2024-05-03 |
Madrid |
139 |
Fluid Flow Control in the Process Industry |
2024-04-29 |
2024-05-03 |
Barcelona |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-04-29 |
2024-05-03 |
Toronto |
364 |
Flow Measurement and Custody Transfer |
2024-04-29 |
2024-05-03 |
Munich |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-04-29 |
2024-05-03 |
Amsterdam |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-04-29 |
2024-05-03 |
Paris |
361 |
Advanced Vibration Analysis |
2024-04-29 |
2024-05-03 |
Vienna |
135 |
Fundamentals of Chemical Engineering |
2024-04-29 |
2024-05-03 |
Bangkok |
511 |
Process & Mechanical Engineering Essentials |
2024-04-29 |
2024-05-10 |
Marbella |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-04-29 |
2024-05-03 |
Geneva |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-04-29 |
2024-05-03 |
Kuala Lumpur |
547 |
Servo Motor Technology |
2024-05-05 |
2024-05-09 |
Marrakesh |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-05-05 |
2024-05-09 |
Doha |
641 |
Process Equipment & Piping Systems |
2024-05-05 |
2024-05-09 |
Manama |
567 |
Process Engineering Essentials |
2024-05-05 |
2024-05-09 |
Jeddah |
488 |
Shutdowns, Turnarounds and Outages |
2024-05-05 |
2024-05-09 |
Tunisia |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-05-05 |
2024-05-09 |
Amman |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-05-05 |
2024-05-09 |
DUBAI |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-05-05 |
2024-05-09 |
Casablanca |
142 |
Welding Technology |
2024-05-05 |
2024-05-09 |
DUBAI |
135 |
Fundamentals of Chemical Engineering |
2024-05-05 |
2024-05-09 |
Muscat |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-05-05 |
2024-05-16 |
Sharm ElShaikh |
644 |
Safe Isolation of Plant and Equipment |
2024-05-05 |
2024-05-09 |
Beirut |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-05-05 |
2024-05-09 |
Riyadh |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-05-05 |
2024-05-09 |
Amman |
793 |
Chemical Handling Awareness |
2024-05-05 |
2024-05-09 |
Amman |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-05-06 |
2024-05-10 |
Marbella |
345 |
Production Chemistry – OGPC |
2024-05-06 |
2024-05-10 |
Geneva |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-05-06 |
2024-05-10 |
Singapore |
486 |
Process Plant Start_up and Commissioning |
2024-05-06 |
2024-05-10 |
Jakarta |
119 |
Fundamentals of Mechanical Technology |
2024-05-06 |
2024-05-10 |
Beijing |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-05-06 |
2024-05-10 |
Istanbul |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-05-06 |
2024-05-10 |
Rome |
541 |
Root Cause Failure Analysis |
2024-05-06 |
2024-05-10 |
Kuala Lumpur |
139 |
Fluid Flow Control in the Process Industry |
2024-05-06 |
2024-05-10 |
London |
511 |
Process & Mechanical Engineering Essentials |
2024-05-06 |
2024-05-17 |
Paris |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-05-06 |
2024-05-10 |
Barcelona |
125 |
Mechanical Equipment |
2024-05-06 |
2024-05-10 |
Amsterdam |
364 |
Flow Measurement and Custody Transfer |
2024-05-06 |
2024-05-10 |
Prague |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-05-06 |
2024-05-10 |
Toronto |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-05-06 |
2024-05-10 |
Madrid |
361 |
Advanced Vibration Analysis |
2024-05-06 |
2024-05-10 |
Munich |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-05-06 |
2024-05-10 |
Vienna |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-05-06 |
2024-05-10 |
Bangkok |
737 |
ISO 17025 Laboratory Quality Management |
2024-05-06 |
2024-05-10 |
Kuala Lumpur |
793 |
Chemical Handling Awareness |
2024-05-06 |
2024-05-10 |
Marbella |
139 |
Fluid Flow Control in the Process Industry |
2024-05-12 |
2024-05-16 |
Cairo |
641 |
Process Equipment & Piping Systems |
2024-05-12 |
2024-05-16 |
Beirut |
547 |
Servo Motor Technology |
2024-05-12 |
2024-05-16 |
Sharm ElShaikh |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-05-12 |
2024-05-23 |
Doha |
567 |
Process Engineering Essentials |
2024-05-12 |
2024-05-16 |
Manama |
486 |
Process Plant Start_up and Commissioning |
2024-05-12 |
2024-05-16 |
Tunisia |
541 |
Root Cause Failure Analysis |
2024-05-12 |
2024-05-16 |
Amman |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-05-12 |
2024-05-16 |
Jeddah |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-05-12 |
2024-05-16 |
Marrakesh |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-05-12 |
2024-05-16 |
Casablanca |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-05-12 |
2024-05-16 |
Kuwait |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-05-12 |
2024-05-16 |
DUBAI |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-05-12 |
2024-05-16 |
Riyadh |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-05-12 |
2024-05-16 |
Muscat |
737 |
ISO 17025 Laboratory Quality Management |
2024-05-12 |
2024-05-16 |
Amman |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-05-12 |
2024-05-16 |
Marrakesh |
119 |
Fundamentals of Mechanical Technology |
2024-05-12 |
2024-05-16 |
Khobar |
644 |
Safe Isolation of Plant and Equipment |
2024-05-13 |
2024-05-17 |
Singapore |
345 |
Production Chemistry – OGPC |
2024-05-13 |
2024-05-17 |
Vienna |
142 |
Welding Technology |
2024-05-13 |
2024-05-17 |
Geneva |
488 |
Shutdowns, Turnarounds and Outages |
2024-05-13 |
2024-05-17 |
Marbella |
125 |
Mechanical Equipment |
2024-05-13 |
2024-05-17 |
Bangkok |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-05-13 |
2024-05-17 |
Jakarta |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-05-13 |
2024-05-17 |
Istanbul |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-05-13 |
2024-05-17 |
Kuala Lumpur |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-05-13 |
2024-05-17 |
Paris |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-05-13 |
2024-05-17 |
London |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-05-13 |
2024-05-17 |
Barcelona |
364 |
Flow Measurement and Custody Transfer |
2024-05-13 |
2024-05-17 |
Rome |
361 |
Advanced Vibration Analysis |
2024-05-13 |
2024-05-17 |
Prague |
135 |
Fundamentals of Chemical Engineering |
2024-05-13 |
2024-05-17 |
Toronto |
119 |
Fundamentals of Mechanical Technology |
2024-05-13 |
2024-05-17 |
Amsterdam |
511 |
Process & Mechanical Engineering Essentials |
2024-05-13 |
2024-05-24 |
Madrid |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-05-13 |
2024-05-17 |
Munich |
793 |
Chemical Handling Awareness |
2024-05-13 |
2024-05-17 |
London |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-05-19 |
2024-05-23 |
Cairo |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-05-19 |
2024-05-30 |
Casablanca |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-05-19 |
2024-05-23 |
Jeddah |
125 |
Mechanical Equipment |
2024-05-19 |
2024-05-23 |
Muscat |
541 |
Root Cause Failure Analysis |
2024-05-19 |
2024-05-23 |
Marrakesh |
567 |
Process Engineering Essentials |
2024-05-19 |
2024-05-23 |
Beirut |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-05-19 |
2024-05-23 |
Sharm ElShaikh |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-05-19 |
2024-05-23 |
Manama |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-05-19 |
2024-05-23 |
Tunisia |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-05-19 |
2024-05-23 |
Amman |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-05-19 |
2024-05-23 |
Riyadh |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-05-19 |
2024-05-23 |
DUBAI |
644 |
Safe Isolation of Plant and Equipment |
2024-05-19 |
2024-05-23 |
Kuwait |
547 |
Servo Motor Technology |
2024-05-19 |
2024-05-23 |
Doha |
511 |
Process & Mechanical Engineering Essentials |
2024-05-19 |
2024-05-30 |
DUBAI |
737 |
ISO 17025 Laboratory Quality Management |
2024-05-19 |
2024-05-23 |
Marrakesh |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-05-19 |
2024-05-23 |
Sharm ElShaikh |
139 |
Fluid Flow Control in the Process Industry |
2024-05-19 |
2024-05-23 |
Khobar |
541 |
Root Cause Failure Analysis |
2024-05-19 |
2024-05-23 |
Khobar |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-05-19 |
2024-05-23 |
Khobar |
511 |
Process & Mechanical Engineering Essentials |
2024-05-19 |
2024-05-30 |
Khobar |
793 |
Chemical Handling Awareness |
2024-05-19 |
2024-05-23 |
Doha |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-05-20 |
2024-05-24 |
Madrid |
345 |
Production Chemistry – OGPC |
2024-05-20 |
2024-05-24 |
Munich |
142 |
Welding Technology |
2024-05-20 |
2024-05-24 |
Vienna |
488 |
Shutdowns, Turnarounds and Outages |
2024-05-20 |
2024-05-24 |
Paris |
641 |
Process Equipment & Piping Systems |
2024-05-20 |
2024-05-24 |
Singapore |
486 |
Process Plant Start_up and Commissioning |
2024-05-20 |
2024-05-24 |
Marbella |
119 |
Fundamentals of Mechanical Technology |
2024-05-20 |
2024-05-24 |
Bangkok |
139 |
Fluid Flow Control in the Process Industry |
2024-05-20 |
2024-05-24 |
Geneva |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-05-20 |
2024-05-24 |
Istanbul |
364 |
Flow Measurement and Custody Transfer |
2024-05-20 |
2024-05-24 |
Jakarta |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-05-20 |
2024-05-24 |
London |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-05-20 |
2024-05-24 |
Kuala Lumpur |
361 |
Advanced Vibration Analysis |
2024-05-20 |
2024-05-24 |
Rome |
135 |
Fundamentals of Chemical Engineering |
2024-05-20 |
2024-05-24 |
Barcelona |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-05-20 |
2024-05-24 |
Prague |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-05-20 |
2024-05-24 |
Toronto |
793 |
Chemical Handling Awareness |
2024-05-20 |
2024-05-24 |
Geneva |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-05-26 |
2024-05-30 |
Jeddah |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-05-26 |
2024-05-30 |
DUBAI |
641 |
Process Equipment & Piping Systems |
2024-05-26 |
2024-05-30 |
Kuwait |
547 |
Servo Motor Technology |
2024-05-26 |
2024-05-30 |
Casablanca |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-05-26 |
2024-05-30 |
Doha |
119 |
Fundamentals of Mechanical Technology |
2024-05-26 |
2024-05-30 |
Muscat |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-05-26 |
2024-05-30 |
Beirut |
541 |
Root Cause Failure Analysis |
2024-05-26 |
2024-05-30 |
Sharm ElShaikh |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-05-26 |
2024-05-30 |
Manama |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-05-26 |
2024-05-30 |
Cairo |
364 |
Flow Measurement and Custody Transfer |
2024-05-26 |
2024-05-30 |
Tunisia |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-05-26 |
2024-05-30 |
Amman |
644 |
Safe Isolation of Plant and Equipment |
2024-05-26 |
2024-05-30 |
DUBAI |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-05-26 |
2024-06-06 |
Riyadh |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-05-26 |
2024-05-30 |
Marrakesh |
737 |
ISO 17025 Laboratory Quality Management |
2024-05-26 |
2024-05-30 |
Sharm ElShaikh |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-05-26 |
2024-05-30 |
Doha |
793 |
Chemical Handling Awareness |
2024-05-26 |
2024-05-30 |
Tunisia |
345 |
Production Chemistry – OGPC |
2024-05-27 |
2024-05-31 |
Prague |
142 |
Welding Technology |
2024-05-27 |
2024-05-31 |
Munich |
488 |
Shutdowns, Turnarounds and Outages |
2024-05-27 |
2024-05-31 |
Madrid |
125 |
Mechanical Equipment |
2024-05-27 |
2024-05-31 |
Toronto |
486 |
Process Plant Start_up and Commissioning |
2024-05-27 |
2024-05-31 |
Paris |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-05-27 |
2024-05-31 |
Marbella |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-05-27 |
2024-05-31 |
Barcelona |
139 |
Fluid Flow Control in the Process Industry |
2024-05-27 |
2024-05-31 |
Vienna |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-05-27 |
2024-05-31 |
Geneva |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-05-27 |
2024-05-31 |
Istanbul |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-05-27 |
2024-05-31 |
Kuala Lumpur |
361 |
Advanced Vibration Analysis |
2024-05-27 |
2024-05-31 |
Jakarta |
135 |
Fundamentals of Chemical Engineering |
2024-05-27 |
2024-05-31 |
London |
567 |
Process Engineering Essentials |
2024-05-27 |
2024-05-31 |
Singapore |
511 |
Process & Mechanical Engineering Essentials |
2024-05-27 |
2024-06-07 |
Kuala Lumpur |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-05-27 |
2024-05-31 |
Rome |
541 |
Root Cause Failure Analysis |
2024-06-02 |
2024-06-06 |
Doha |
641 |
Process Equipment & Piping Systems |
2024-06-02 |
2024-06-06 |
DUBAI |
488 |
Shutdowns, Turnarounds and Outages |
2024-06-02 |
2024-06-06 |
DUBAI |
567 |
Process Engineering Essentials |
2024-06-02 |
2024-06-06 |
Kuwait |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-06-02 |
2024-06-06 |
Casablanca |
135 |
Fundamentals of Chemical Engineering |
2024-06-02 |
2024-06-06 |
Cairo |
547 |
Servo Motor Technology |
2024-06-02 |
2024-06-06 |
Riyadh |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-06-02 |
2024-06-06 |
Beirut |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-06-02 |
2024-06-06 |
Sharm ElShaikh |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-06-02 |
2024-06-06 |
Manama |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-06-02 |
2024-06-06 |
Amman |
361 |
Advanced Vibration Analysis |
2024-06-02 |
2024-06-06 |
Tunisia |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-06-02 |
2024-06-06 |
Marrakesh |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-06-02 |
2024-06-06 |
Jeddah |
511 |
Process & Mechanical Engineering Essentials |
2024-06-02 |
2024-06-13 |
Amman |
737 |
ISO 17025 Laboratory Quality Management |
2024-06-02 |
2024-06-06 |
Doha |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-06-02 |
2024-06-06 |
Casablanca |
345 |
Production Chemistry – OGPC |
2024-06-02 |
2024-06-06 |
Khobar |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-06-03 |
2024-06-07 |
Kuala Lumpur |
345 |
Production Chemistry – OGPC |
2024-06-03 |
2024-06-07 |
Rome |
142 |
Welding Technology |
2024-06-03 |
2024-06-07 |
Prague |
486 |
Process Plant Start_up and Commissioning |
2024-06-03 |
2024-06-07 |
Madrid |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-06-03 |
2024-06-14 |
Istanbul |
119 |
Fundamentals of Mechanical Technology |
2024-06-03 |
2024-06-07 |
Toronto |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-06-03 |
2024-06-07 |
Paris |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-06-03 |
2024-06-07 |
Singapore |
139 |
Fluid Flow Control in the Process Industry |
2024-06-03 |
2024-06-07 |
Munich |
125 |
Mechanical Equipment |
2024-06-03 |
2024-06-07 |
Barcelona |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-06-03 |
2024-06-07 |
Vienna |
364 |
Flow Measurement and Custody Transfer |
2024-06-03 |
2024-06-07 |
Marbella |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-06-03 |
2024-06-07 |
Geneva |
644 |
Safe Isolation of Plant and Equipment |
2024-06-03 |
2024-06-07 |
Kuala Lumpur |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-06-03 |
2024-06-07 |
Jakarta |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-06-03 |
2024-06-07 |
London |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-06-09 |
2024-06-13 |
Amman |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-06-09 |
2024-06-13 |
Cairo |
511 |
Process & Mechanical Engineering Essentials |
2024-06-09 |
2024-06-20 |
Marrakesh |
567 |
Process Engineering Essentials |
2024-06-09 |
2024-06-13 |
DUBAI |
486 |
Process Plant Start_up and Commissioning |
2024-06-09 |
2024-06-13 |
DUBAI |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-06-09 |
2024-06-13 |
Marrakesh |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-06-09 |
2024-06-13 |
Kuwait |
541 |
Root Cause Failure Analysis |
2024-06-09 |
2024-06-13 |
Casablanca |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-06-09 |
2024-06-20 |
Jeddah |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-06-09 |
2024-06-13 |
Doha |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-06-09 |
2024-06-13 |
Beirut |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-06-09 |
2024-06-13 |
Manama |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-06-09 |
2024-06-13 |
Sharm ElShaikh |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-06-09 |
2024-06-13 |
Riyadh |
644 |
Safe Isolation of Plant and Equipment |
2024-06-09 |
2024-06-13 |
Amman |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-06-09 |
2024-06-13 |
Tunisia |
737 |
ISO 17025 Laboratory Quality Management |
2024-06-09 |
2024-06-13 |
Casablanca |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-06-09 |
2024-06-13 |
Riyadh |
345 |
Production Chemistry – OGPC |
2024-06-10 |
2024-06-14 |
Jakarta |
142 |
Welding Technology |
2024-06-10 |
2024-06-14 |
Rome |
641 |
Process Equipment & Piping Systems |
2024-06-10 |
2024-06-14 |
Kuala Lumpur |
488 |
Shutdowns, Turnarounds and Outages |
2024-06-10 |
2024-06-14 |
Kuala Lumpur |
125 |
Mechanical Equipment |
2024-06-10 |
2024-06-14 |
London |
547 |
Servo Motor Technology |
2024-06-10 |
2024-06-14 |
Istanbul |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-06-10 |
2024-06-14 |
Madrid |
139 |
Fluid Flow Control in the Process Industry |
2024-06-10 |
2024-06-14 |
Prague |
364 |
Flow Measurement and Custody Transfer |
2024-06-10 |
2024-06-14 |
Paris |
119 |
Fundamentals of Mechanical Technology |
2024-06-10 |
2024-06-14 |
Barcelona |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-06-10 |
2024-06-14 |
Munich |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-06-10 |
2024-06-14 |
Vienna |
361 |
Advanced Vibration Analysis |
2024-06-10 |
2024-06-14 |
Marbella |
135 |
Fundamentals of Chemical Engineering |
2024-06-10 |
2024-06-14 |
Geneva |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-06-10 |
2024-06-14 |
Singapore |
547 |
Servo Motor Technology |
2024-06-16 |
2024-06-20 |
Jeddah |
541 |
Root Cause Failure Analysis |
2024-06-16 |
2024-06-20 |
Riyadh |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-06-16 |
2024-06-20 |
Doha |
345 |
Production Chemistry – OGPC |
2024-06-16 |
2024-06-20 |
Tunisia |
644 |
Safe Isolation of Plant and Equipment |
2024-06-16 |
2024-06-20 |
Marrakesh |
641 |
Process Equipment & Piping Systems |
2024-06-16 |
2024-06-20 |
Amman |
488 |
Shutdowns, Turnarounds and Outages |
2024-06-16 |
2024-06-20 |
Amman |
125 |
Mechanical Equipment |
2024-06-16 |
2024-06-20 |
Cairo |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-06-16 |
2024-06-20 |
DUBAI |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-06-16 |
2024-06-20 |
DUBAI |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-06-16 |
2024-06-27 |
Manama |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-06-16 |
2024-06-20 |
Kuwait |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-06-16 |
2024-06-20 |
Casablanca |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-06-16 |
2024-06-20 |
Beirut |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-06-16 |
2024-06-20 |
Sharm ElShaikh |
511 |
Process & Mechanical Engineering Essentials |
2024-06-16 |
2024-06-27 |
Sharm ElShaikh |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-06-16 |
2024-06-20 |
Marrakesh |
737 |
ISO 17025 Laboratory Quality Management |
2024-06-16 |
2024-06-20 |
Riyadh |
142 |
Welding Technology |
2024-06-17 |
2024-06-21 |
Jakarta |
567 |
Process Engineering Essentials |
2024-06-17 |
2024-06-21 |
Kuala Lumpur |
486 |
Process Plant Start_up and Commissioning |
2024-06-17 |
2024-06-21 |
Kuala Lumpur |
119 |
Fundamentals of Mechanical Technology |
2024-06-17 |
2024-06-21 |
London |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-06-17 |
2024-06-21 |
Istanbul |
139 |
Fluid Flow Control in the Process Industry |
2024-06-17 |
2024-06-21 |
Rome |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-06-17 |
2024-06-21 |
Prague |
361 |
Advanced Vibration Analysis |
2024-06-17 |
2024-06-21 |
Paris |
364 |
Flow Measurement and Custody Transfer |
2024-06-17 |
2024-06-21 |
Madrid |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-06-17 |
2024-06-21 |
Munich |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-06-17 |
2024-06-21 |
Singapore |
135 |
Fundamentals of Chemical Engineering |
2024-06-17 |
2024-06-21 |
Vienna |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-06-17 |
2024-06-21 |
Marbella |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-06-17 |
2024-06-21 |
Geneva |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-06-17 |
2024-06-21 |
Istanbul |
488 |
Shutdowns, Turnarounds and Outages |
2024-06-23 |
2024-06-27 |
Marrakesh |
511 |
Process & Mechanical Engineering Essentials |
2024-06-23 |
2024-07-04 |
Doha |
641 |
Process Equipment & Piping Systems |
2024-06-23 |
2024-06-27 |
Marrakesh |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-06-23 |
2024-06-27 |
Sharm ElShaikh |
142 |
Welding Technology |
2024-06-23 |
2024-06-27 |
Tunisia |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-06-23 |
2024-06-27 |
Riyadh |
547 |
Servo Motor Technology |
2024-06-23 |
2024-06-27 |
Manama |
567 |
Process Engineering Essentials |
2024-06-23 |
2024-06-27 |
Amman |
486 |
Process Plant Start_up and Commissioning |
2024-06-23 |
2024-06-27 |
Amman |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-06-23 |
2024-07-04 |
Beirut |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-06-23 |
2024-06-27 |
DUBAI |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-06-23 |
2024-06-27 |
Jeddah |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-06-23 |
2024-06-27 |
Kuwait |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-06-23 |
2024-06-27 |
Doha |
364 |
Flow Measurement and Custody Transfer |
2024-06-23 |
2024-06-27 |
DUBAI |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-06-23 |
2024-06-27 |
Casablanca |
644 |
Safe Isolation of Plant and Equipment |
2024-06-23 |
2024-06-27 |
Sharm ElShaikh |
119 |
Fundamentals of Mechanical Technology |
2024-06-23 |
2024-06-27 |
Cairo |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-06-23 |
2024-06-27 |
Jeddah |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-06-23 |
2024-06-27 |
DUBAI |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-06-24 |
2024-06-28 |
Paris |
345 |
Production Chemistry – OGPC |
2024-06-24 |
2024-06-28 |
Marbella |
125 |
Mechanical Equipment |
2024-06-24 |
2024-06-28 |
Geneva |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-06-24 |
2024-06-28 |
Kuala Lumpur |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-06-24 |
2024-06-28 |
Kuala Lumpur |
541 |
Root Cause Failure Analysis |
2024-06-24 |
2024-06-28 |
Istanbul |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-06-24 |
2024-06-28 |
Singapore |
139 |
Fluid Flow Control in the Process Industry |
2024-06-24 |
2024-06-28 |
Jakarta |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-06-24 |
2024-06-28 |
Rome |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-06-24 |
2024-06-28 |
Prague |
361 |
Advanced Vibration Analysis |
2024-06-24 |
2024-06-28 |
Madrid |
135 |
Fundamentals of Chemical Engineering |
2024-06-24 |
2024-06-28 |
Munich |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-06-24 |
2024-06-28 |
Vienna |
737 |
ISO 17025 Laboratory Quality Management |
2024-06-24 |
2024-06-28 |
Istanbul |
644 |
Safe Isolation of Plant and Equipment |
2024-06-30 |
2024-07-04 |
Doha |
567 |
Process Engineering Essentials |
2024-06-30 |
2024-07-04 |
Marrakesh |
486 |
Process Plant Start_up and Commissioning |
2024-06-30 |
2024-07-04 |
Marrakesh |
641 |
Process Equipment & Piping Systems |
2024-06-30 |
2024-07-04 |
Sharm ElShaikh |
488 |
Shutdowns, Turnarounds and Outages |
2024-06-30 |
2024-07-04 |
Sharm ElShaikh |
547 |
Servo Motor Technology |
2024-06-30 |
2024-07-04 |
Beirut |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-06-30 |
2024-07-04 |
Manama |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-06-30 |
2024-07-04 |
Amman |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-06-30 |
2024-07-04 |
Amman |
139 |
Fluid Flow Control in the Process Industry |
2024-06-30 |
2024-07-04 |
Tunisia |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-06-30 |
2024-07-04 |
DUBAI |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-06-30 |
2024-07-04 |
Riyadh |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-06-30 |
2024-07-04 |
Kuwait |
541 |
Root Cause Failure Analysis |
2024-06-30 |
2024-07-04 |
Jeddah |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-06-30 |
2024-07-04 |
Casablanca |
361 |
Advanced Vibration Analysis |
2024-06-30 |
2024-07-04 |
DUBAI |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-06-30 |
2024-07-04 |
Doha |
511 |
Process & Mechanical Engineering Essentials |
2024-06-30 |
2024-07-11 |
Casablanca |
737 |
ISO 17025 Laboratory Quality Management |
2024-06-30 |
2024-07-04 |
Jeddah |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-06-30 |
2024-07-04 |
Manama |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-06-30 |
2024-07-11 |
DUBAI |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-06-30 |
2024-07-04 |
Cairo |
142 |
Welding Technology |
2024-07-01 |
2024-07-05 |
Marbella |
125 |
Mechanical Equipment |
2024-07-01 |
2024-07-05 |
Vienna |
119 |
Fundamentals of Mechanical Technology |
2024-07-01 |
2024-07-05 |
Geneva |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-07-01 |
2024-07-05 |
Kuala Lumpur |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-07-01 |
2024-07-05 |
Istanbul |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-07-01 |
2024-07-05 |
Jakarta |
364 |
Flow Measurement and Custody Transfer |
2024-07-01 |
2024-07-05 |
Kuala Lumpur |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-07-01 |
2024-07-05 |
Rome |
345 |
Production Chemistry – OGPC |
2024-07-01 |
2024-07-05 |
Paris |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-07-01 |
2024-07-12 |
Singapore |
135 |
Fundamentals of Chemical Engineering |
2024-07-01 |
2024-07-05 |
Prague |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-07-01 |
2024-07-05 |
Madrid |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-07-01 |
2024-07-05 |
Munich |
511 |
Process & Mechanical Engineering Essentials |
2024-07-07 |
2024-07-18 |
Riyadh |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-07-07 |
2024-07-11 |
Casablanca |
567 |
Process Engineering Essentials |
2024-07-07 |
2024-07-11 |
Sharm ElShaikh |
486 |
Process Plant Start_up and Commissioning |
2024-07-07 |
2024-07-11 |
Sharm ElShaikh |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-07-07 |
2024-07-11 |
Beirut |
541 |
Root Cause Failure Analysis |
2024-07-07 |
2024-07-11 |
Manama |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-07-07 |
2024-07-11 |
Marrakesh |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-07-07 |
2024-07-11 |
Amman |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-07-07 |
2024-07-11 |
Riyadh |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-07-07 |
2024-07-18 |
Kuwait |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-07-07 |
2024-07-11 |
Tunisia |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-07-07 |
2024-07-11 |
DUBAI |
364 |
Flow Measurement and Custody Transfer |
2024-07-07 |
2024-07-11 |
Amman |
488 |
Shutdowns, Turnarounds and Outages |
2024-07-07 |
2024-07-11 |
Doha |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-07-07 |
2024-07-11 |
Marrakesh |
644 |
Safe Isolation of Plant and Equipment |
2024-07-07 |
2024-07-11 |
Casablanca |
641 |
Process Equipment & Piping Systems |
2024-07-07 |
2024-07-11 |
Doha |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-07-07 |
2024-07-11 |
DUBAI |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-07-07 |
2024-07-11 |
Jeddah |
737 |
ISO 17025 Laboratory Quality Management |
2024-07-07 |
2024-07-11 |
Manama |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-07-07 |
2024-07-11 |
Beirut |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-07-07 |
2024-07-11 |
DUBAI |
345 |
Production Chemistry – OGPC |
2024-07-08 |
2024-07-12 |
Madrid |
125 |
Mechanical Equipment |
2024-07-08 |
2024-07-12 |
Munich |
119 |
Fundamentals of Mechanical Technology |
2024-07-08 |
2024-07-12 |
Vienna |
142 |
Welding Technology |
2024-07-08 |
2024-07-12 |
Paris |
139 |
Fluid Flow Control in the Process Industry |
2024-07-08 |
2024-07-12 |
Marbella |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-07-08 |
2024-07-12 |
Kuala Lumpur |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-07-08 |
2024-07-12 |
Jakarta |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-07-08 |
2024-07-12 |
Istanbul |
361 |
Advanced Vibration Analysis |
2024-07-08 |
2024-07-12 |
Kuala Lumpur |
135 |
Fundamentals of Chemical Engineering |
2024-07-08 |
2024-07-12 |
Rome |
547 |
Servo Motor Technology |
2024-07-08 |
2024-07-12 |
Singapore |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-07-08 |
2024-07-12 |
Prague |
793 |
Chemical Handling Awareness |
2024-07-08 |
2024-07-12 |
Trabzon |
644 |
Safe Isolation of Plant and Equipment |
2024-07-14 |
2024-07-18 |
Riyadh |
345 |
Production Chemistry – OGPC |
2024-07-14 |
2024-07-18 |
DUBAI |
641 |
Process Equipment & Piping Systems |
2024-07-14 |
2024-07-18 |
Casablanca |
488 |
Shutdowns, Turnarounds and Outages |
2024-07-14 |
2024-07-18 |
Casablanca |
547 |
Servo Motor Technology |
2024-07-14 |
2024-07-18 |
Kuwait |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-07-14 |
2024-07-18 |
Jeddah |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-07-14 |
2024-07-18 |
Sharm ElShaikh |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-07-14 |
2024-07-18 |
Sharm ElShaikh |
541 |
Root Cause Failure Analysis |
2024-07-14 |
2024-07-18 |
Beirut |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-07-14 |
2024-07-18 |
Marrakesh |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-07-14 |
2024-07-18 |
Manama |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-07-14 |
2024-07-18 |
Amman |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-07-14 |
2024-07-18 |
Tunisia |
361 |
Advanced Vibration Analysis |
2024-07-14 |
2024-07-18 |
Amman |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-07-14 |
2024-07-18 |
Riyadh |
364 |
Flow Measurement and Custody Transfer |
2024-07-14 |
2024-07-18 |
Marrakesh |
486 |
Process Plant Start_up and Commissioning |
2024-07-14 |
2024-07-18 |
Doha |
567 |
Process Engineering Essentials |
2024-07-14 |
2024-07-18 |
Doha |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-07-14 |
2024-07-25 |
DUBAI |
737 |
ISO 17025 Laboratory Quality Management |
2024-07-14 |
2024-07-18 |
Beirut |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-07-14 |
2024-07-18 |
Khobar |
142 |
Welding Technology |
2024-07-15 |
2024-07-19 |
Madrid |
125 |
Mechanical Equipment |
2024-07-15 |
2024-07-19 |
Prague |
119 |
Fundamentals of Mechanical Technology |
2024-07-15 |
2024-07-19 |
Munich |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-07-15 |
2024-07-19 |
Singapore |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-07-15 |
2024-07-19 |
Marbella |
139 |
Fluid Flow Control in the Process Industry |
2024-07-15 |
2024-07-19 |
Paris |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-07-15 |
2024-07-19 |
Kuala Lumpur |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-07-15 |
2024-07-19 |
Istanbul |
135 |
Fundamentals of Chemical Engineering |
2024-07-15 |
2024-07-19 |
Jakarta |
511 |
Process & Mechanical Engineering Essentials |
2024-07-15 |
2024-07-26 |
Istanbul |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-07-15 |
2024-07-19 |
Kuala Lumpur |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-07-15 |
2024-07-19 |
Rome |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-07-15 |
2024-07-19 |
Singapore |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-07-15 |
2024-07-19 |
London |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-07-21 |
2024-07-25 |
Marrakesh |
142 |
Welding Technology |
2024-07-21 |
2024-07-25 |
DUBAI |
641 |
Process Equipment & Piping Systems |
2024-07-21 |
2024-07-25 |
Riyadh |
547 |
Servo Motor Technology |
2024-07-21 |
2024-07-25 |
DUBAI |
567 |
Process Engineering Essentials |
2024-07-21 |
2024-07-25 |
Casablanca |
486 |
Process Plant Start_up and Commissioning |
2024-07-21 |
2024-07-25 |
Casablanca |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-07-21 |
2024-07-25 |
Kuwait |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-07-21 |
2024-07-25 |
Doha |
488 |
Shutdowns, Turnarounds and Outages |
2024-07-21 |
2024-07-25 |
Riyadh |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-07-21 |
2024-07-25 |
Sharm ElShaikh |
511 |
Process & Mechanical Engineering Essentials |
2024-07-21 |
2024-08-01 |
Jeddah |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-07-21 |
2024-07-25 |
Doha |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-07-21 |
2024-07-25 |
Beirut |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-07-21 |
2024-07-25 |
Amman |
364 |
Flow Measurement and Custody Transfer |
2024-07-21 |
2024-07-25 |
Sharm ElShaikh |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-07-21 |
2024-07-25 |
Manama |
135 |
Fundamentals of Chemical Engineering |
2024-07-21 |
2024-07-25 |
Tunisia |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-07-21 |
2024-07-25 |
Jeddah |
361 |
Advanced Vibration Analysis |
2024-07-21 |
2024-07-25 |
Marrakesh |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-07-21 |
2024-07-25 |
Amman |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-07-21 |
2024-07-25 |
Kuwait |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-07-22 |
2024-07-26 |
Istanbul |
345 |
Production Chemistry – OGPC |
2024-07-22 |
2024-07-26 |
Kuala Lumpur |
541 |
Root Cause Failure Analysis |
2024-07-22 |
2024-07-26 |
Singapore |
125 |
Mechanical Equipment |
2024-07-22 |
2024-07-26 |
Rome |
119 |
Fundamentals of Mechanical Technology |
2024-07-22 |
2024-07-26 |
Prague |
139 |
Fluid Flow Control in the Process Industry |
2024-07-22 |
2024-07-26 |
Madrid |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-07-22 |
2024-07-26 |
Paris |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-07-22 |
2024-07-26 |
Marbella |
644 |
Safe Isolation of Plant and Equipment |
2024-07-22 |
2024-07-26 |
Istanbul |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-07-22 |
2024-07-26 |
Jakarta |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-07-22 |
2024-08-02 |
Kuala Lumpur |
737 |
ISO 17025 Laboratory Quality Management |
2024-07-22 |
2024-07-26 |
Singapore |
793 |
Chemical Handling Awareness |
2024-07-22 |
2024-07-26 |
Toronto |
345 |
Production Chemistry – OGPC |
2024-07-28 |
2024-08-01 |
Amman |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-07-28 |
2024-08-01 |
DUBAI |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-07-28 |
2024-08-01 |
Casablanca |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-07-28 |
2024-08-01 |
Casablanca |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-07-28 |
2024-08-01 |
Marrakesh |
541 |
Root Cause Failure Analysis |
2024-07-28 |
2024-08-01 |
Kuwait |
364 |
Flow Measurement and Custody Transfer |
2024-07-28 |
2024-08-01 |
Doha |
139 |
Fluid Flow Control in the Process Industry |
2024-07-28 |
2024-08-01 |
DUBAI |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-07-28 |
2024-08-01 |
Marrakesh |
644 |
Safe Isolation of Plant and Equipment |
2024-07-28 |
2024-08-01 |
Jeddah |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-07-28 |
2024-08-01 |
Sharm ElShaikh |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-07-28 |
2024-08-01 |
Manama |
486 |
Process Plant Start_up and Commissioning |
2024-07-28 |
2024-08-01 |
Riyadh |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-07-28 |
2024-08-01 |
Beirut |
361 |
Advanced Vibration Analysis |
2024-07-28 |
2024-08-01 |
Sharm ElShaikh |
567 |
Process Engineering Essentials |
2024-07-28 |
2024-08-01 |
Riyadh |
511 |
Process & Mechanical Engineering Essentials |
2024-07-28 |
2024-08-08 |
Manama |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-07-28 |
2024-08-01 |
Tunisia |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-07-28 |
2024-08-08 |
Amman |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-07-28 |
2024-08-01 |
Doha |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-07-28 |
2024-08-01 |
Jeddah |
737 |
ISO 17025 Laboratory Quality Management |
2024-07-28 |
2024-08-01 |
Kuwait |
567 |
Process Engineering Essentials |
2024-07-28 |
2024-08-01 |
Khobar |
641 |
Process Equipment & Piping Systems |
2024-07-28 |
2024-08-01 |
Khobar |
644 |
Safe Isolation of Plant and Equipment |
2024-07-28 |
2024-08-01 |
Khobar |
142 |
Welding Technology |
2024-07-29 |
2024-08-02 |
Kuala Lumpur |
641 |
Process Equipment & Piping Systems |
2024-07-29 |
2024-08-02 |
Istanbul |
488 |
Shutdowns, Turnarounds and Outages |
2024-07-29 |
2024-08-02 |
Istanbul |
125 |
Mechanical Equipment |
2024-07-29 |
2024-08-02 |
Jakarta |
547 |
Servo Motor Technology |
2024-07-29 |
2024-08-02 |
Kuala Lumpur |
119 |
Fundamentals of Mechanical Technology |
2024-07-29 |
2024-08-02 |
Rome |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-07-29 |
2024-08-02 |
Paris |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-07-29 |
2024-08-02 |
Madrid |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-07-29 |
2024-08-02 |
Singapore |
135 |
Fundamentals of Chemical Engineering |
2024-07-29 |
2024-08-02 |
Marbella |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-07-29 |
2024-08-02 |
Berlin |
488 |
Shutdowns, Turnarounds and Outages |
2024-08-04 |
2024-08-08 |
Jeddah |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-08-04 |
2024-08-08 |
Doha |
142 |
Welding Technology |
2024-08-04 |
2024-08-08 |
Amman |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-08-04 |
2024-08-08 |
Manama |
125 |
Mechanical Equipment |
2024-08-04 |
2024-08-08 |
Tunisia |
547 |
Servo Motor Technology |
2024-08-04 |
2024-08-08 |
Amman |
541 |
Root Cause Failure Analysis |
2024-08-04 |
2024-08-08 |
DUBAI |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-08-04 |
2024-08-08 |
Riyadh |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-08-04 |
2024-08-08 |
Casablanca |
641 |
Process Equipment & Piping Systems |
2024-08-04 |
2024-08-08 |
Jeddah |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-08-04 |
2024-08-08 |
Riyadh |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-08-04 |
2024-08-08 |
Kuwait |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-08-04 |
2024-08-08 |
DUBAI |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-08-04 |
2024-08-15 |
Marrakesh |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-08-04 |
2024-08-08 |
Sharm ElShaikh |
364 |
Flow Measurement and Custody Transfer |
2024-08-04 |
2024-08-08 |
Casablanca |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-08-04 |
2024-08-08 |
Beirut |
361 |
Advanced Vibration Analysis |
2024-08-04 |
2024-08-08 |
Doha |
644 |
Safe Isolation of Plant and Equipment |
2024-08-04 |
2024-08-08 |
Manama |
511 |
Process & Mechanical Engineering Essentials |
2024-08-04 |
2024-08-15 |
Beirut |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-08-04 |
2024-08-08 |
Sharm ElShaikh |
345 |
Production Chemistry – OGPC |
2024-08-04 |
2024-08-08 |
Marrakesh |
364 |
Flow Measurement and Custody Transfer |
2024-08-04 |
2024-08-08 |
DUBAI |
567 |
Process Engineering Essentials |
2024-08-05 |
2024-08-09 |
Istanbul |
486 |
Process Plant Start_up and Commissioning |
2024-08-05 |
2024-08-09 |
Istanbul |
119 |
Fundamentals of Mechanical Technology |
2024-08-05 |
2024-08-09 |
Jakarta |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-08-05 |
2024-08-09 |
Kuala Lumpur |
135 |
Fundamentals of Chemical Engineering |
2024-08-05 |
2024-08-09 |
Paris |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-08-05 |
2024-08-09 |
Singapore |
139 |
Fluid Flow Control in the Process Industry |
2024-08-05 |
2024-08-09 |
Kuala Lumpur |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-08-05 |
2024-08-09 |
Madrid |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-08-05 |
2024-08-09 |
Marbella |
737 |
ISO 17025 Laboratory Quality Management |
2024-08-05 |
2024-08-09 |
Berlin |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-08-05 |
2024-08-09 |
Brussels |
793 |
Chemical Handling Awareness |
2024-08-05 |
2024-08-09 |
Prague |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-08-11 |
2024-08-15 |
Doha |
547 |
Servo Motor Technology |
2024-08-11 |
2024-08-15 |
Marrakesh |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-08-11 |
2024-08-15 |
Doha |
345 |
Production Chemistry – OGPC |
2024-08-11 |
2024-08-15 |
Sharm ElShaikh |
486 |
Process Plant Start_up and Commissioning |
2024-08-11 |
2024-08-15 |
Jeddah |
641 |
Process Equipment & Piping Systems |
2024-08-11 |
2024-08-15 |
Manama |
488 |
Shutdowns, Turnarounds and Outages |
2024-08-11 |
2024-08-15 |
Manama |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-08-11 |
2024-08-15 |
Beirut |
364 |
Flow Measurement and Custody Transfer |
2024-08-11 |
2024-08-15 |
Riyadh |
567 |
Process Engineering Essentials |
2024-08-11 |
2024-08-15 |
Jeddah |
119 |
Fundamentals of Mechanical Technology |
2024-08-11 |
2024-08-15 |
Tunisia |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-08-11 |
2024-08-15 |
Amman |
139 |
Fluid Flow Control in the Process Industry |
2024-08-11 |
2024-08-15 |
Amman |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-08-11 |
2024-08-15 |
DUBAI |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-08-11 |
2024-08-15 |
Casablanca |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-08-11 |
2024-08-15 |
DUBAI |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-08-11 |
2024-08-15 |
Kuwait |
361 |
Advanced Vibration Analysis |
2024-08-11 |
2024-08-15 |
Casablanca |
644 |
Safe Isolation of Plant and Equipment |
2024-08-11 |
2024-08-15 |
Beirut |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-08-11 |
2024-08-22 |
Sharm ElShaikh |
142 |
Welding Technology |
2024-08-11 |
2024-08-15 |
Marrakesh |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-08-11 |
2024-08-15 |
Riyadh |
511 |
Process & Mechanical Engineering Essentials |
2024-08-12 |
2024-08-23 |
Singapore |
125 |
Mechanical Equipment |
2024-08-12 |
2024-08-16 |
Marbella |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-08-12 |
2024-08-16 |
Istanbul |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-08-12 |
2024-08-16 |
Istanbul |
541 |
Root Cause Failure Analysis |
2024-08-12 |
2024-08-16 |
Kuala Lumpur |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-08-12 |
2024-08-16 |
Singapore |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-08-12 |
2024-08-16 |
Kuala Lumpur |
135 |
Fundamentals of Chemical Engineering |
2024-08-12 |
2024-08-16 |
Madrid |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-08-12 |
2024-08-16 |
Paris |
737 |
ISO 17025 Laboratory Quality Management |
2024-08-12 |
2024-08-16 |
Brussels |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-08-12 |
2024-08-16 |
Zurich |
142 |
Welding Technology |
2024-08-18 |
2024-08-22 |
Sharm ElShaikh |
641 |
Process Equipment & Piping Systems |
2024-08-18 |
2024-08-22 |
Beirut |
488 |
Shutdowns, Turnarounds and Outages |
2024-08-18 |
2024-08-22 |
Beirut |
547 |
Servo Motor Technology |
2024-08-18 |
2024-08-22 |
Sharm ElShaikh |
567 |
Process Engineering Essentials |
2024-08-18 |
2024-08-22 |
Manama |
486 |
Process Plant Start_up and Commissioning |
2024-08-18 |
2024-08-22 |
Manama |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-08-18 |
2024-08-22 |
Jeddah |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-08-18 |
2024-08-22 |
Jeddah |
541 |
Root Cause Failure Analysis |
2024-08-18 |
2024-08-22 |
Amman |
361 |
Advanced Vibration Analysis |
2024-08-18 |
2024-08-22 |
Riyadh |
139 |
Fluid Flow Control in the Process Industry |
2024-08-18 |
2024-08-22 |
Marrakesh |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-08-18 |
2024-08-22 |
Amman |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-08-18 |
2024-08-22 |
Riyadh |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-08-18 |
2024-08-22 |
Casablanca |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-08-18 |
2024-08-22 |
Kuwait |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-08-18 |
2024-08-22 |
DUBAI |
135 |
Fundamentals of Chemical Engineering |
2024-08-18 |
2024-08-22 |
DUBAI |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-08-18 |
2024-08-22 |
Marrakesh |
511 |
Process & Mechanical Engineering Essentials |
2024-08-18 |
2024-08-29 |
Kuwait |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-08-18 |
2024-08-22 |
Casablanca |
345 |
Production Chemistry – OGPC |
2024-08-18 |
2024-08-22 |
Doha |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-08-18 |
2024-08-29 |
Doha |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-08-18 |
2024-08-22 |
Khobar |
644 |
Safe Isolation of Plant and Equipment |
2024-08-19 |
2024-08-23 |
Singapore |
125 |
Mechanical Equipment |
2024-08-19 |
2024-08-23 |
Paris |
119 |
Fundamentals of Mechanical Technology |
2024-08-19 |
2024-08-23 |
Marbella |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-08-19 |
2024-08-23 |
Istanbul |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-08-19 |
2024-08-23 |
Kuala Lumpur |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-08-19 |
2024-08-23 |
Singapore |
364 |
Flow Measurement and Custody Transfer |
2024-08-19 |
2024-08-23 |
Istanbul |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-08-19 |
2024-08-23 |
Kuala Lumpur |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-08-19 |
2024-08-23 |
Madrid |
737 |
ISO 17025 Laboratory Quality Management |
2024-08-19 |
2024-08-23 |
Zurich |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-08-19 |
2024-08-23 |
Trabzon |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-08-25 |
2024-08-29 |
Riyadh |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-08-25 |
2024-08-29 |
Marrakesh |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-08-25 |
2024-08-29 |
Riyadh |
345 |
Production Chemistry – OGPC |
2024-08-25 |
2024-08-29 |
Casablanca |
567 |
Process Engineering Essentials |
2024-08-25 |
2024-08-29 |
Beirut |
486 |
Process Plant Start_up and Commissioning |
2024-08-25 |
2024-08-29 |
Beirut |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-08-25 |
2024-08-29 |
Sharm ElShaikh |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-08-25 |
2024-08-29 |
Kuwait |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-08-25 |
2024-08-29 |
Manama |
142 |
Welding Technology |
2024-08-25 |
2024-08-29 |
Doha |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-08-25 |
2024-08-29 |
Manama |
139 |
Fluid Flow Control in the Process Industry |
2024-08-25 |
2024-08-29 |
Sharm ElShaikh |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-08-25 |
2024-08-29 |
Amman |
547 |
Servo Motor Technology |
2024-08-25 |
2024-08-29 |
Doha |
364 |
Flow Measurement and Custody Transfer |
2024-08-25 |
2024-08-29 |
Jeddah |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-08-25 |
2024-08-29 |
Amman |
644 |
Safe Isolation of Plant and Equipment |
2024-08-25 |
2024-08-29 |
Kuwait |
541 |
Root Cause Failure Analysis |
2024-08-25 |
2024-08-29 |
Marrakesh |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-08-25 |
2024-08-29 |
Jeddah |
511 |
Process & Mechanical Engineering Essentials |
2024-08-25 |
2024-09-05 |
DUBAI |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-08-25 |
2024-08-29 |
DUBAI |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-08-25 |
2024-09-05 |
Casablanca |
793 |
Chemical Handling Awareness |
2024-08-25 |
2024-08-29 |
Khobar |
641 |
Process Equipment & Piping Systems |
2024-08-26 |
2024-08-30 |
Singapore |
125 |
Mechanical Equipment |
2024-08-26 |
2024-08-30 |
Madrid |
488 |
Shutdowns, Turnarounds and Outages |
2024-08-26 |
2024-08-30 |
Singapore |
119 |
Fundamentals of Mechanical Technology |
2024-08-26 |
2024-08-30 |
Paris |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-08-26 |
2024-08-30 |
Istanbul |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-08-26 |
2024-08-30 |
Berlin |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-08-26 |
2024-08-30 |
Kuala Lumpur |
361 |
Advanced Vibration Analysis |
2024-08-26 |
2024-08-30 |
Istanbul |
135 |
Fundamentals of Chemical Engineering |
2024-08-26 |
2024-08-30 |
Kuala Lumpur |
737 |
ISO 17025 Laboratory Quality Management |
2024-08-26 |
2024-08-30 |
Trabzon |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-08-26 |
2024-08-30 |
Beijing |
793 |
Chemical Handling Awareness |
2024-08-26 |
2024-08-30 |
Beijing |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-09-01 |
2024-09-05 |
Jeddah |
142 |
Welding Technology |
2024-09-01 |
2024-09-05 |
Casablanca |
641 |
Process Equipment & Piping Systems |
2024-09-01 |
2024-09-05 |
Kuwait |
488 |
Shutdowns, Turnarounds and Outages |
2024-09-01 |
2024-09-05 |
Kuwait |
125 |
Mechanical Equipment |
2024-09-01 |
2024-09-05 |
DUBAI |
547 |
Servo Motor Technology |
2024-09-01 |
2024-09-05 |
Casablanca |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-09-01 |
2024-09-05 |
Marrakesh |
361 |
Advanced Vibration Analysis |
2024-09-01 |
2024-09-05 |
Jeddah |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-09-01 |
2024-09-05 |
Beirut |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-09-01 |
2024-09-05 |
Beirut |
541 |
Root Cause Failure Analysis |
2024-09-01 |
2024-09-05 |
Sharm ElShaikh |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-09-01 |
2024-09-05 |
Manama |
345 |
Production Chemistry – OGPC |
2024-09-01 |
2024-09-05 |
Riyadh |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-09-01 |
2024-09-05 |
Doha |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-09-01 |
2024-09-05 |
Sharm ElShaikh |
364 |
Flow Measurement and Custody Transfer |
2024-09-01 |
2024-09-05 |
Manama |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-09-01 |
2024-09-05 |
DUBAI |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-09-01 |
2024-09-05 |
Amman |
135 |
Fundamentals of Chemical Engineering |
2024-09-01 |
2024-09-05 |
Amman |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-09-01 |
2024-09-12 |
Riyadh |
139 |
Fluid Flow Control in the Process Industry |
2024-09-01 |
2024-09-05 |
Doha |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-09-01 |
2024-09-05 |
Marrakesh |
793 |
Chemical Handling Awareness |
2024-09-01 |
2024-09-05 |
Tunisia |
119 |
Fundamentals of Mechanical Technology |
2024-09-02 |
2024-09-06 |
Madrid |
486 |
Process Plant Start_up and Commissioning |
2024-09-02 |
2024-09-06 |
Singapore |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-09-02 |
2024-09-06 |
Istanbul |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-09-02 |
2024-09-06 |
Brussels |
567 |
Process Engineering Essentials |
2024-09-02 |
2024-09-06 |
Singapore |
644 |
Safe Isolation of Plant and Equipment |
2024-09-02 |
2024-09-06 |
Berlin |
511 |
Process & Mechanical Engineering Essentials |
2024-09-02 |
2024-09-13 |
Kuala Lumpur |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-09-02 |
2024-09-06 |
Istanbul |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-09-02 |
2024-09-06 |
Kuala Lumpur |
737 |
ISO 17025 Laboratory Quality Management |
2024-09-02 |
2024-09-06 |
Beijing |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-09-02 |
2024-09-06 |
Amsterdam |
135 |
Fundamentals of Chemical Engineering |
2024-09-08 |
2024-09-12 |
Marrakesh |
488 |
Shutdowns, Turnarounds and Outages |
2024-09-08 |
2024-09-12 |
DUBAI |
567 |
Process Engineering Essentials |
2024-09-08 |
2024-09-12 |
Kuwait |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-09-08 |
2024-09-12 |
Doha |
486 |
Process Plant Start_up and Commissioning |
2024-09-08 |
2024-09-12 |
Kuwait |
119 |
Fundamentals of Mechanical Technology |
2024-09-08 |
2024-09-12 |
DUBAI |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-09-08 |
2024-09-12 |
Casablanca |
142 |
Welding Technology |
2024-09-08 |
2024-09-12 |
Riyadh |
547 |
Servo Motor Technology |
2024-09-08 |
2024-09-12 |
Riyadh |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-09-08 |
2024-09-12 |
Jeddah |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-09-08 |
2024-09-12 |
Beirut |
139 |
Fluid Flow Control in the Process Industry |
2024-09-08 |
2024-09-12 |
Casablanca |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-09-08 |
2024-09-12 |
Sharm ElShaikh |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-09-08 |
2024-09-12 |
Manama |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-09-08 |
2024-09-12 |
Marrakesh |
364 |
Flow Measurement and Custody Transfer |
2024-09-08 |
2024-09-12 |
Beirut |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-09-08 |
2024-09-12 |
Sharm ElShaikh |
361 |
Advanced Vibration Analysis |
2024-09-08 |
2024-09-12 |
Manama |
541 |
Root Cause Failure Analysis |
2024-09-08 |
2024-09-12 |
Doha |
511 |
Process & Mechanical Engineering Essentials |
2024-09-08 |
2024-09-19 |
Amman |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-09-08 |
2024-09-12 |
Jeddah |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-09-08 |
2024-09-12 |
Amman |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-09-08 |
2024-09-12 |
Khobar |
345 |
Production Chemistry – OGPC |
2024-09-09 |
2024-09-13 |
Istanbul |
641 |
Process Equipment & Piping Systems |
2024-09-09 |
2024-09-13 |
Berlin |
125 |
Mechanical Equipment |
2024-09-09 |
2024-09-13 |
Kuala Lumpur |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-09-09 |
2024-09-13 |
Zurich |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-09-09 |
2024-09-13 |
Kuala Lumpur |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-09-09 |
2024-09-13 |
Singapore |
644 |
Safe Isolation of Plant and Equipment |
2024-09-09 |
2024-09-13 |
Brussels |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-09-09 |
2024-09-20 |
Istanbul |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-09-09 |
2024-09-13 |
Singapore |
737 |
ISO 17025 Laboratory Quality Management |
2024-09-09 |
2024-09-13 |
Amsterdam |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-09-09 |
2024-09-13 |
Bangkok |
793 |
Chemical Handling Awareness |
2024-09-09 |
2024-09-13 |
Munich |
125 |
Mechanical Equipment |
2024-09-15 |
2024-09-19 |
Amman |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-09-15 |
2024-09-19 |
Amman |
486 |
Process Plant Start_up and Commissioning |
2024-09-15 |
2024-09-19 |
DUBAI |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-09-15 |
2024-09-26 |
Jeddah |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-09-15 |
2024-09-19 |
Kuwait |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-09-15 |
2024-09-19 |
Doha |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-09-15 |
2024-09-19 |
Kuwait |
541 |
Root Cause Failure Analysis |
2024-09-15 |
2024-09-19 |
Casablanca |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-09-15 |
2024-09-19 |
Beirut |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-09-15 |
2024-09-19 |
Casablanca |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-09-15 |
2024-09-19 |
Riyadh |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-09-15 |
2024-09-19 |
Manama |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-09-15 |
2024-09-19 |
Sharm ElShaikh |
361 |
Advanced Vibration Analysis |
2024-09-15 |
2024-09-19 |
Beirut |
135 |
Fundamentals of Chemical Engineering |
2024-09-15 |
2024-09-19 |
Sharm ElShaikh |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-09-15 |
2024-09-19 |
Marrakesh |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-09-15 |
2024-09-19 |
Manama |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-09-15 |
2024-09-19 |
Doha |
511 |
Process & Mechanical Engineering Essentials |
2024-09-15 |
2024-09-26 |
Marrakesh |
139 |
Fluid Flow Control in the Process Industry |
2024-09-15 |
2024-09-19 |
Riyadh |
345 |
Production Chemistry – OGPC |
2024-09-15 |
2024-09-19 |
Jeddah |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-09-15 |
2024-09-19 |
Muscat |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-09-15 |
2024-09-19 |
Khobar |
793 |
Chemical Handling Awareness |
2024-09-15 |
2024-09-19 |
Jeddah |
793 |
Chemical Handling Awareness |
2024-09-15 |
2024-09-19 |
Beirut |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-09-16 |
2024-09-20 |
Singapore |
641 |
Process Equipment & Piping Systems |
2024-09-16 |
2024-09-20 |
Brussels |
142 |
Welding Technology |
2024-09-16 |
2024-09-20 |
Istanbul |
488 |
Shutdowns, Turnarounds and Outages |
2024-09-16 |
2024-09-20 |
Kuala Lumpur |
547 |
Servo Motor Technology |
2024-09-16 |
2024-09-20 |
Istanbul |
567 |
Process Engineering Essentials |
2024-09-16 |
2024-09-20 |
Berlin |
364 |
Flow Measurement and Custody Transfer |
2024-09-16 |
2024-09-20 |
Singapore |
119 |
Fundamentals of Mechanical Technology |
2024-09-16 |
2024-09-20 |
Kuala Lumpur |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-09-16 |
2024-09-20 |
Trabzon |
644 |
Safe Isolation of Plant and Equipment |
2024-09-16 |
2024-09-20 |
Zurich |
737 |
ISO 17025 Laboratory Quality Management |
2024-09-16 |
2024-09-20 |
Bangkok |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-09-22 |
2024-09-26 |
Marrakesh |
125 |
Mechanical Equipment |
2024-09-22 |
2024-09-26 |
Marrakesh |
547 |
Servo Motor Technology |
2024-09-22 |
2024-09-26 |
Jeddah |
345 |
Production Chemistry – OGPC |
2024-09-22 |
2024-09-26 |
Manama |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-09-22 |
2024-09-26 |
Doha |
488 |
Shutdowns, Turnarounds and Outages |
2024-09-22 |
2024-09-26 |
Amman |
119 |
Fundamentals of Mechanical Technology |
2024-09-22 |
2024-09-26 |
Amman |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-09-22 |
2024-09-26 |
DUBAI |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-09-22 |
2024-09-26 |
Riyadh |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-09-22 |
2024-09-26 |
Kuwait |
135 |
Fundamentals of Chemical Engineering |
2024-09-22 |
2024-09-26 |
Doha |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-09-22 |
2024-09-26 |
Casablanca |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-09-22 |
2024-09-26 |
Beirut |
364 |
Flow Measurement and Custody Transfer |
2024-09-22 |
2024-09-26 |
Kuwait |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-09-22 |
2024-09-26 |
Casablanca |
541 |
Root Cause Failure Analysis |
2024-09-22 |
2024-09-26 |
Riyadh |
511 |
Process & Mechanical Engineering Essentials |
2024-09-22 |
2024-10-03 |
Sharm ElShaikh |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-09-22 |
2024-09-26 |
Beirut |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-09-22 |
2024-09-26 |
Sharm ElShaikh |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-09-22 |
2024-10-03 |
Manama |
142 |
Welding Technology |
2024-09-22 |
2024-09-26 |
Jeddah |
737 |
ISO 17025 Laboratory Quality Management |
2024-09-22 |
2024-09-26 |
Muscat |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-09-22 |
2024-09-26 |
Khobar |
641 |
Process Equipment & Piping Systems |
2024-09-23 |
2024-09-27 |
Zurich |
567 |
Process Engineering Essentials |
2024-09-23 |
2024-09-27 |
Brussels |
486 |
Process Plant Start_up and Commissioning |
2024-09-23 |
2024-09-27 |
Kuala Lumpur |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-09-23 |
2024-09-27 |
Istanbul |
361 |
Advanced Vibration Analysis |
2024-09-23 |
2024-09-27 |
Singapore |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-09-23 |
2024-09-27 |
Singapore |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-09-23 |
2024-09-27 |
Berlin |
139 |
Fluid Flow Control in the Process Industry |
2024-09-23 |
2024-09-27 |
Istanbul |
644 |
Safe Isolation of Plant and Equipment |
2024-09-23 |
2024-09-27 |
Trabzon |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-09-23 |
2024-09-27 |
Beijing |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-09-23 |
2024-09-27 |
Toronto |
793 |
Chemical Handling Awareness |
2024-09-23 |
2024-09-27 |
Berlin |
793 |
Chemical Handling Awareness |
2024-09-23 |
2024-09-27 |
Zurich |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-09-29 |
2024-10-03 |
Riyadh |
511 |
Process & Mechanical Engineering Essentials |
2024-09-29 |
2024-10-10 |
Doha |
488 |
Shutdowns, Turnarounds and Outages |
2024-09-29 |
2024-10-03 |
Marrakesh |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-09-29 |
2024-10-03 |
Doha |
345 |
Production Chemistry – OGPC |
2024-09-29 |
2024-10-03 |
Beirut |
142 |
Welding Technology |
2024-09-29 |
2024-10-03 |
Manama |
119 |
Fundamentals of Mechanical Technology |
2024-09-29 |
2024-10-03 |
Marrakesh |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-09-29 |
2024-10-03 |
Jeddah |
125 |
Mechanical Equipment |
2024-09-29 |
2024-10-03 |
Sharm ElShaikh |
547 |
Servo Motor Technology |
2024-09-29 |
2024-10-03 |
Manama |
486 |
Process Plant Start_up and Commissioning |
2024-09-29 |
2024-10-03 |
Amman |
139 |
Fluid Flow Control in the Process Industry |
2024-09-29 |
2024-10-03 |
Jeddah |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-09-29 |
2024-10-03 |
Riyadh |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-09-29 |
2024-10-03 |
Sharm ElShaikh |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-09-29 |
2024-10-03 |
Kuwait |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-09-29 |
2024-10-03 |
Casablanca |
364 |
Flow Measurement and Custody Transfer |
2024-09-29 |
2024-10-03 |
DUBAI |
361 |
Advanced Vibration Analysis |
2024-09-29 |
2024-10-03 |
Kuwait |
135 |
Fundamentals of Chemical Engineering |
2024-09-29 |
2024-10-03 |
Casablanca |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-09-29 |
2024-10-10 |
Beirut |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-09-29 |
2024-10-03 |
Khobar |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-09-30 |
2024-10-04 |
Singapore |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-09-30 |
2024-10-04 |
Singapore |
641 |
Process Equipment & Piping Systems |
2024-09-30 |
2024-10-04 |
Trabzon |
567 |
Process Engineering Essentials |
2024-09-30 |
2024-10-04 |
Zurich |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-09-30 |
2024-10-04 |
Brussels |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-09-30 |
2024-10-04 |
Amsterdam |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-09-30 |
2024-10-04 |
Kuala Lumpur |
541 |
Root Cause Failure Analysis |
2024-09-30 |
2024-10-04 |
Istanbul |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-09-30 |
2024-10-04 |
Berlin |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-09-30 |
2024-10-04 |
Istanbul |
644 |
Safe Isolation of Plant and Equipment |
2024-09-30 |
2024-10-04 |
Beijing |
737 |
ISO 17025 Laboratory Quality Management |
2024-09-30 |
2024-10-04 |
Toronto |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-09-30 |
2024-10-04 |
Barcelona |
793 |
Chemical Handling Awareness |
2024-09-30 |
2024-10-04 |
Vienna |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-10-06 |
2024-10-10 |
Jeddah |
142 |
Welding Technology |
2024-10-06 |
2024-10-10 |
Beirut |
488 |
Shutdowns, Turnarounds and Outages |
2024-10-06 |
2024-10-10 |
Sharm ElShaikh |
547 |
Servo Motor Technology |
2024-10-06 |
2024-10-10 |
Beirut |
135 |
Fundamentals of Chemical Engineering |
2024-10-06 |
2024-10-10 |
Riyadh |
119 |
Fundamentals of Mechanical Technology |
2024-10-06 |
2024-10-10 |
Sharm ElShaikh |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-10-06 |
2024-10-10 |
Manama |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-10-06 |
2024-10-10 |
Amman |
125 |
Mechanical Equipment |
2024-10-06 |
2024-10-10 |
Doha |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-10-06 |
2024-10-10 |
Riyadh |
139 |
Fluid Flow Control in the Process Industry |
2024-10-06 |
2024-10-10 |
Manama |
486 |
Process Plant Start_up and Commissioning |
2024-10-06 |
2024-10-10 |
Marrakesh |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-10-06 |
2024-10-10 |
Kuwait |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-10-06 |
2024-10-10 |
Doha |
361 |
Advanced Vibration Analysis |
2024-10-06 |
2024-10-10 |
DUBAI |
541 |
Root Cause Failure Analysis |
2024-10-06 |
2024-10-10 |
Jeddah |
511 |
Process & Mechanical Engineering Essentials |
2024-10-06 |
2024-10-17 |
Casablanca |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-10-06 |
2024-10-10 |
Kuwait |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-10-06 |
2024-10-10 |
Casablanca |
793 |
Chemical Handling Awareness |
2024-10-06 |
2024-10-10 |
Marrakesh |
641 |
Process Equipment & Piping Systems |
2024-10-07 |
2024-10-11 |
Beijing |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-10-07 |
2024-10-11 |
Zurich |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-10-07 |
2024-10-11 |
Brussels |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-10-07 |
2024-10-11 |
Istanbul |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-10-07 |
2024-10-11 |
Berlin |
345 |
Production Chemistry – OGPC |
2024-10-07 |
2024-10-11 |
Singapore |
364 |
Flow Measurement and Custody Transfer |
2024-10-07 |
2024-10-11 |
Kuala Lumpur |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-10-07 |
2024-10-11 |
Istanbul |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-10-07 |
2024-10-11 |
Bangkok |
567 |
Process Engineering Essentials |
2024-10-07 |
2024-10-11 |
Trabzon |
644 |
Safe Isolation of Plant and Equipment |
2024-10-07 |
2024-10-11 |
Amsterdam |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-10-07 |
2024-10-18 |
Singapore |
737 |
ISO 17025 Laboratory Quality Management |
2024-10-07 |
2024-10-11 |
Barcelona |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-10-07 |
2024-10-11 |
London |
793 |
Chemical Handling Awareness |
2024-10-07 |
2024-10-11 |
Istanbul |
511 |
Process & Mechanical Engineering Essentials |
2024-10-13 |
2024-10-24 |
Riyadh |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-10-13 |
2024-10-17 |
Riyadh |
125 |
Mechanical Equipment |
2024-10-13 |
2024-10-17 |
Casablanca |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-10-13 |
2024-10-17 |
Jeddah |
486 |
Process Plant Start_up and Commissioning |
2024-10-13 |
2024-10-17 |
Sharm ElShaikh |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-10-13 |
2024-10-17 |
Beirut |
119 |
Fundamentals of Mechanical Technology |
2024-10-13 |
2024-10-17 |
Doha |
541 |
Root Cause Failure Analysis |
2024-10-13 |
2024-10-17 |
Manama |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-10-13 |
2024-10-17 |
Casablanca |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-10-13 |
2024-10-17 |
Marrakesh |
139 |
Fluid Flow Control in the Process Industry |
2024-10-13 |
2024-10-17 |
Beirut |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-10-13 |
2024-10-17 |
Manama |
364 |
Flow Measurement and Custody Transfer |
2024-10-13 |
2024-10-17 |
Amman |
488 |
Shutdowns, Turnarounds and Outages |
2024-10-13 |
2024-10-17 |
Doha |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-10-13 |
2024-10-17 |
Muscat |
345 |
Production Chemistry – OGPC |
2024-10-13 |
2024-10-17 |
Kuwait |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-10-13 |
2024-10-17 |
DUBAI |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-10-13 |
2024-10-24 |
Kuwait |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-10-13 |
2024-10-17 |
Jeddah |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-10-13 |
2024-10-17 |
Cairo |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-10-13 |
2024-10-17 |
Khobar |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-10-13 |
2024-10-17 |
Khobar |
641 |
Process Equipment & Piping Systems |
2024-10-14 |
2024-10-18 |
Amsterdam |
567 |
Process Engineering Essentials |
2024-10-14 |
2024-10-18 |
Beijing |
142 |
Welding Technology |
2024-10-14 |
2024-10-18 |
Singapore |
547 |
Servo Motor Technology |
2024-10-14 |
2024-10-18 |
Singapore |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-10-14 |
2024-10-18 |
Zurich |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-10-14 |
2024-10-18 |
Brussels |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-10-14 |
2024-10-18 |
Istanbul |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-10-14 |
2024-10-18 |
Berlin |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-10-14 |
2024-10-18 |
Trabzon |
361 |
Advanced Vibration Analysis |
2024-10-14 |
2024-10-18 |
Kuala Lumpur |
135 |
Fundamentals of Chemical Engineering |
2024-10-14 |
2024-10-18 |
Istanbul |
644 |
Safe Isolation of Plant and Equipment |
2024-10-14 |
2024-10-18 |
Bangkok |
737 |
ISO 17025 Laboratory Quality Management |
2024-10-14 |
2024-10-18 |
London |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-10-20 |
2024-10-24 |
Riyadh |
142 |
Welding Technology |
2024-10-20 |
2024-10-24 |
Kuwait |
488 |
Shutdowns, Turnarounds and Outages |
2024-10-20 |
2024-10-24 |
Casablanca |
547 |
Servo Motor Technology |
2024-10-20 |
2024-10-24 |
Kuwait |
119 |
Fundamentals of Mechanical Technology |
2024-10-20 |
2024-10-24 |
Casablanca |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-10-20 |
2024-10-24 |
Sharm ElShaikh |
541 |
Root Cause Failure Analysis |
2024-10-20 |
2024-10-24 |
Beirut |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-10-20 |
2024-10-24 |
Jeddah |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-10-20 |
2024-10-24 |
Manama |
486 |
Process Plant Start_up and Commissioning |
2024-10-20 |
2024-10-24 |
Doha |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-10-20 |
2024-10-24 |
Beirut |
125 |
Mechanical Equipment |
2024-10-20 |
2024-10-24 |
Riyadh |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-10-20 |
2024-10-24 |
Manama |
361 |
Advanced Vibration Analysis |
2024-10-20 |
2024-10-24 |
Amman |
644 |
Safe Isolation of Plant and Equipment |
2024-10-20 |
2024-10-24 |
Muscat |
345 |
Production Chemistry – OGPC |
2024-10-20 |
2024-10-24 |
DUBAI |
135 |
Fundamentals of Chemical Engineering |
2024-10-20 |
2024-10-24 |
Jeddah |
364 |
Flow Measurement and Custody Transfer |
2024-10-20 |
2024-10-24 |
Marrakesh |
737 |
ISO 17025 Laboratory Quality Management |
2024-10-20 |
2024-10-24 |
Cairo |
486 |
Process Plant Start_up and Commissioning |
2024-10-20 |
2024-10-24 |
Khobar |
793 |
Chemical Handling Awareness |
2024-10-20 |
2024-10-24 |
DUBAI |
641 |
Process Equipment & Piping Systems |
2024-10-21 |
2024-10-25 |
Bangkok |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-10-21 |
2024-10-25 |
Beijing |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-10-21 |
2024-10-25 |
Singapore |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-10-21 |
2024-10-25 |
Zurich |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-10-21 |
2024-10-25 |
Trabzon |
139 |
Fluid Flow Control in the Process Industry |
2024-10-21 |
2024-10-25 |
Singapore |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-10-21 |
2024-10-25 |
Brussels |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-10-21 |
2024-10-25 |
Toronto |
511 |
Process & Mechanical Engineering Essentials |
2024-10-21 |
2024-11-01 |
Istanbul |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-10-21 |
2024-10-25 |
Kuala Lumpur |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-10-21 |
2024-10-25 |
Istanbul |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-10-21 |
2024-11-01 |
Berlin |
567 |
Process Engineering Essentials |
2024-10-21 |
2024-10-25 |
Amsterdam |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-10-21 |
2024-10-25 |
Geneva |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-10-27 |
2024-10-31 |
Doha |
142 |
Welding Technology |
2024-10-27 |
2024-10-31 |
DUBAI |
486 |
Process Plant Start_up and Commissioning |
2024-10-27 |
2024-10-31 |
Casablanca |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-10-27 |
2024-10-31 |
Kuwait |
488 |
Shutdowns, Turnarounds and Outages |
2024-10-27 |
2024-10-31 |
Riyadh |
361 |
Advanced Vibration Analysis |
2024-10-27 |
2024-10-31 |
Marrakesh |
139 |
Fluid Flow Control in the Process Industry |
2024-10-27 |
2024-10-31 |
Kuwait |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-10-27 |
2024-10-31 |
Beirut |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-10-27 |
2024-10-31 |
Jeddah |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-10-27 |
2024-10-31 |
Manama |
364 |
Flow Measurement and Custody Transfer |
2024-10-27 |
2024-10-31 |
Sharm ElShaikh |
641 |
Process Equipment & Piping Systems |
2024-10-27 |
2024-10-31 |
Muscat |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-10-27 |
2024-10-31 |
Beirut |
135 |
Fundamentals of Chemical Engineering |
2024-10-27 |
2024-10-31 |
Manama |
511 |
Process & Mechanical Engineering Essentials |
2024-10-27 |
2024-11-07 |
Jeddah |
119 |
Fundamentals of Mechanical Technology |
2024-10-27 |
2024-10-31 |
Riyadh |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-10-27 |
2024-10-31 |
Amman |
793 |
Chemical Handling Awareness |
2024-10-27 |
2024-10-31 |
Riyadh |
125 |
Mechanical Equipment |
2024-10-28 |
2024-11-01 |
Istanbul |
547 |
Servo Motor Technology |
2024-10-28 |
2024-11-01 |
Berlin |
567 |
Process Engineering Essentials |
2024-10-28 |
2024-11-01 |
Bangkok |
541 |
Root Cause Failure Analysis |
2024-10-28 |
2024-11-01 |
Singapore |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-10-28 |
2024-11-01 |
Beijing |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-10-28 |
2024-11-01 |
Istanbul |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-10-28 |
2024-11-01 |
Zurich |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-10-28 |
2024-11-01 |
Barcelona |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-10-28 |
2024-11-01 |
Amsterdam |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-10-28 |
2024-11-01 |
Trabzon |
644 |
Safe Isolation of Plant and Equipment |
2024-10-28 |
2024-11-01 |
Toronto |
345 |
Production Chemistry – OGPC |
2024-10-28 |
2024-11-01 |
Kuala Lumpur |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-10-28 |
2024-11-01 |
Singapore |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-10-28 |
2024-11-08 |
Brussels |
737 |
ISO 17025 Laboratory Quality Management |
2024-10-28 |
2024-11-01 |
Geneva |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-10-28 |
2024-11-01 |
Vienna |
793 |
Chemical Handling Awareness |
2024-10-28 |
2024-11-01 |
Brussels |
125 |
Mechanical Equipment |
2024-11-03 |
2024-11-07 |
Jeddah |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-11-03 |
2024-11-07 |
Marrakesh |
486 |
Process Plant Start_up and Commissioning |
2024-11-03 |
2024-11-07 |
Riyadh |
567 |
Process Engineering Essentials |
2024-11-03 |
2024-11-07 |
Muscat |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-11-03 |
2024-11-07 |
Casablanca |
541 |
Root Cause Failure Analysis |
2024-11-03 |
2024-11-07 |
Kuwait |
364 |
Flow Measurement and Custody Transfer |
2024-11-03 |
2024-11-07 |
Doha |
139 |
Fluid Flow Control in the Process Industry |
2024-11-03 |
2024-11-07 |
DUBAI |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-11-03 |
2024-11-07 |
Jeddah |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-11-03 |
2024-11-07 |
Kuwait |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-11-03 |
2024-11-07 |
Beirut |
361 |
Advanced Vibration Analysis |
2024-11-03 |
2024-11-07 |
Sharm ElShaikh |
135 |
Fundamentals of Chemical Engineering |
2024-11-03 |
2024-11-07 |
Beirut |
345 |
Production Chemistry – OGPC |
2024-11-03 |
2024-11-07 |
Amman |
511 |
Process & Mechanical Engineering Essentials |
2024-11-03 |
2024-11-14 |
Manama |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-11-03 |
2024-11-07 |
Manama |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-11-04 |
2024-11-08 |
Singapore |
142 |
Welding Technology |
2024-11-04 |
2024-11-08 |
Kuala Lumpur |
488 |
Shutdowns, Turnarounds and Outages |
2024-11-04 |
2024-11-08 |
Istanbul |
547 |
Servo Motor Technology |
2024-11-04 |
2024-11-08 |
Brussels |
119 |
Fundamentals of Mechanical Technology |
2024-11-04 |
2024-11-08 |
Istanbul |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-11-04 |
2024-11-08 |
Berlin |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-11-04 |
2024-11-08 |
Bangkok |
641 |
Process Equipment & Piping Systems |
2024-11-04 |
2024-11-08 |
Toronto |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-11-04 |
2024-11-08 |
Beijing |
644 |
Safe Isolation of Plant and Equipment |
2024-11-04 |
2024-11-08 |
Barcelona |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-11-04 |
2024-11-08 |
Amsterdam |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-11-04 |
2024-11-08 |
London |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-11-04 |
2024-11-08 |
Trabzon |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-11-04 |
2024-11-15 |
Zurich |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-11-04 |
2024-11-08 |
Singapore |
737 |
ISO 17025 Laboratory Quality Management |
2024-11-04 |
2024-11-08 |
Vienna |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-11-04 |
2024-11-08 |
Munich |
793 |
Chemical Handling Awareness |
2024-11-04 |
2024-11-08 |
Barcelona |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-11-10 |
2024-11-14 |
Riyadh |
142 |
Welding Technology |
2024-11-10 |
2024-11-14 |
Amman |
361 |
Advanced Vibration Analysis |
2024-11-10 |
2024-11-14 |
Doha |
125 |
Mechanical Equipment |
2024-11-10 |
2024-11-14 |
Manama |
488 |
Shutdowns, Turnarounds and Outages |
2024-11-10 |
2024-11-14 |
Jeddah |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-11-10 |
2024-11-14 |
Muscat |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-11-10 |
2024-11-14 |
Kuwait |
345 |
Production Chemistry – OGPC |
2024-11-10 |
2024-11-14 |
Marrakesh |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-11-10 |
2024-11-14 |
DUBAI |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-11-10 |
2024-11-14 |
Cairo |
119 |
Fundamentals of Mechanical Technology |
2024-11-10 |
2024-11-14 |
Jeddah |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-11-10 |
2024-11-14 |
Manama |
364 |
Flow Measurement and Custody Transfer |
2024-11-10 |
2024-11-14 |
Casablanca |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-11-10 |
2024-11-14 |
Kuwait |
511 |
Process & Mechanical Engineering Essentials |
2024-11-10 |
2024-11-21 |
Beirut |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-11-10 |
2024-11-14 |
Sharm ElShaikh |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-11-10 |
2024-11-14 |
Beirut |
135 |
Fundamentals of Chemical Engineering |
2024-11-11 |
2024-11-15 |
Singapore |
547 |
Servo Motor Technology |
2024-11-11 |
2024-11-15 |
Zurich |
567 |
Process Engineering Essentials |
2024-11-11 |
2024-11-15 |
Toronto |
486 |
Process Plant Start_up and Commissioning |
2024-11-11 |
2024-11-15 |
Istanbul |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-11-11 |
2024-11-15 |
Brussels |
541 |
Root Cause Failure Analysis |
2024-11-11 |
2024-11-15 |
Berlin |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-11-11 |
2024-11-22 |
Trabzon |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-11-11 |
2024-11-15 |
Singapore |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-11-11 |
2024-11-15 |
Bangkok |
139 |
Fluid Flow Control in the Process Industry |
2024-11-11 |
2024-11-15 |
Kuala Lumpur |
641 |
Process Equipment & Piping Systems |
2024-11-11 |
2024-11-15 |
Barcelona |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-11-11 |
2024-11-15 |
Beijing |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-11-11 |
2024-11-15 |
Amsterdam |
644 |
Safe Isolation of Plant and Equipment |
2024-11-11 |
2024-11-15 |
London |
737 |
ISO 17025 Laboratory Quality Management |
2024-11-11 |
2024-11-15 |
Munich |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-11-11 |
2024-11-15 |
Prague |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-11-17 |
2024-11-21 |
Doha |
488 |
Shutdowns, Turnarounds and Outages |
2024-11-17 |
2024-11-21 |
Manama |
125 |
Mechanical Equipment |
2024-11-17 |
2024-11-21 |
Beirut |
119 |
Fundamentals of Mechanical Technology |
2024-11-17 |
2024-11-21 |
Manama |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-11-17 |
2024-11-21 |
Muscat |
139 |
Fluid Flow Control in the Process Industry |
2024-11-17 |
2024-11-21 |
Amman |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-11-17 |
2024-11-21 |
Kuwait |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-11-17 |
2024-11-21 |
DUBAI |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-11-17 |
2024-11-21 |
Beirut |
361 |
Advanced Vibration Analysis |
2024-11-17 |
2024-11-21 |
Casablanca |
364 |
Flow Measurement and Custody Transfer |
2024-11-17 |
2024-11-21 |
Riyadh |
135 |
Fundamentals of Chemical Engineering |
2024-11-17 |
2024-11-21 |
Kuwait |
486 |
Process Plant Start_up and Commissioning |
2024-11-17 |
2024-11-21 |
Jeddah |
345 |
Production Chemistry – OGPC |
2024-11-17 |
2024-11-21 |
Sharm ElShaikh |
644 |
Safe Isolation of Plant and Equipment |
2024-11-17 |
2024-11-21 |
Cairo |
142 |
Welding Technology |
2024-11-17 |
2024-11-21 |
Marrakesh |
511 |
Process & Mechanical Engineering Essentials |
2024-11-18 |
2024-11-29 |
Singapore |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-11-18 |
2024-11-22 |
Singapore |
547 |
Servo Motor Technology |
2024-11-18 |
2024-11-22 |
Trabzon |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-11-18 |
2024-11-22 |
Zurich |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-11-18 |
2024-11-22 |
Toronto |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-11-18 |
2024-11-22 |
Istanbul |
541 |
Root Cause Failure Analysis |
2024-11-18 |
2024-11-22 |
Brussels |
641 |
Process Equipment & Piping Systems |
2024-11-18 |
2024-11-22 |
London |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-11-18 |
2024-11-22 |
Berlin |
567 |
Process Engineering Essentials |
2024-11-18 |
2024-11-22 |
Barcelona |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-11-18 |
2024-11-22 |
Bangkok |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-11-18 |
2024-11-22 |
Kuala Lumpur |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-11-18 |
2024-11-22 |
Geneva |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-11-18 |
2024-11-29 |
Beijing |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-11-18 |
2024-11-22 |
Amsterdam |
737 |
ISO 17025 Laboratory Quality Management |
2024-11-18 |
2024-11-22 |
Prague |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-11-18 |
2024-11-22 |
Rome |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-11-24 |
2024-11-28 |
Jeddah |
641 |
Process Equipment & Piping Systems |
2024-11-24 |
2024-11-28 |
Cairo |
142 |
Welding Technology |
2024-11-24 |
2024-11-28 |
Sharm ElShaikh |
361 |
Advanced Vibration Analysis |
2024-11-24 |
2024-11-28 |
Riyadh |
488 |
Shutdowns, Turnarounds and Outages |
2024-11-24 |
2024-11-28 |
Beirut |
486 |
Process Plant Start_up and Commissioning |
2024-11-24 |
2024-11-28 |
Manama |
119 |
Fundamentals of Mechanical Technology |
2024-11-24 |
2024-11-28 |
Beirut |
345 |
Production Chemistry – OGPC |
2024-11-24 |
2024-11-28 |
Doha |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-11-24 |
2024-11-28 |
Muscat |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-11-24 |
2024-11-28 |
Amman |
135 |
Fundamentals of Chemical Engineering |
2024-11-24 |
2024-11-28 |
DUBAI |
139 |
Fluid Flow Control in the Process Industry |
2024-11-24 |
2024-11-28 |
Marrakesh |
511 |
Process & Mechanical Engineering Essentials |
2024-11-24 |
2024-12-05 |
Kuwait |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-11-24 |
2024-11-28 |
Casablanca |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-11-24 |
2024-11-28 |
Kuwait |
488 |
Shutdowns, Turnarounds and Outages |
2024-11-24 |
2024-11-28 |
Khobar |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-11-24 |
2024-12-05 |
Khobar |
547 |
Servo Motor Technology |
2024-11-25 |
2024-11-29 |
Beijing |
567 |
Process Engineering Essentials |
2024-11-25 |
2024-11-29 |
London |
541 |
Root Cause Failure Analysis |
2024-11-25 |
2024-11-29 |
Zurich |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-11-25 |
2024-12-06 |
Amsterdam |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-11-25 |
2024-11-29 |
Toronto |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-11-25 |
2024-11-29 |
Brussels |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-11-25 |
2024-11-29 |
Trabzon |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-11-25 |
2024-11-29 |
Berlin |
125 |
Mechanical Equipment |
2024-11-25 |
2024-11-29 |
Singapore |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-11-25 |
2024-11-29 |
Bangkok |
364 |
Flow Measurement and Custody Transfer |
2024-11-25 |
2024-11-29 |
Istanbul |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-11-25 |
2024-11-29 |
Kuala Lumpur |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-11-25 |
2024-11-29 |
Vienna |
644 |
Safe Isolation of Plant and Equipment |
2024-11-25 |
2024-11-29 |
Geneva |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-11-25 |
2024-11-29 |
Barcelona |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-11-25 |
2024-11-29 |
Singapore |
737 |
ISO 17025 Laboratory Quality Management |
2024-11-25 |
2024-11-29 |
Rome |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-11-25 |
2024-11-29 |
Jakarta |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-12-01 |
2024-12-05 |
Riyadh |
125 |
Mechanical Equipment |
2024-12-01 |
2024-12-05 |
Kuwait |
345 |
Production Chemistry – OGPC |
2024-12-01 |
2024-12-05 |
Casablanca |
486 |
Process Plant Start_up and Commissioning |
2024-12-01 |
2024-12-05 |
Beirut |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-12-01 |
2024-12-05 |
Manama |
364 |
Flow Measurement and Custody Transfer |
2024-12-01 |
2024-12-05 |
Jeddah |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-12-01 |
2024-12-05 |
Marrakesh |
139 |
Fluid Flow Control in the Process Industry |
2024-12-01 |
2024-12-05 |
Sharm ElShaikh |
142 |
Welding Technology |
2024-12-01 |
2024-12-05 |
Doha |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-12-01 |
2024-12-05 |
Muscat |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-12-01 |
2024-12-05 |
Amman |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-12-01 |
2024-12-05 |
Kuwait |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-12-01 |
2024-12-05 |
DUBAI |
567 |
Process Engineering Essentials |
2024-12-01 |
2024-12-05 |
Cairo |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-12-01 |
2024-12-05 |
Tunisia |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-12-02 |
2024-12-06 |
Beijing |
119 |
Fundamentals of Mechanical Technology |
2024-12-02 |
2024-12-06 |
Singapore |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-12-02 |
2024-12-06 |
London |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-12-02 |
2024-12-06 |
Barcelona |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-12-02 |
2024-12-06 |
Zurich |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-12-02 |
2024-12-06 |
Toronto |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-12-02 |
2024-12-06 |
Brussels |
541 |
Root Cause Failure Analysis |
2024-12-02 |
2024-12-06 |
Trabzon |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-12-02 |
2024-12-06 |
Munich |
361 |
Advanced Vibration Analysis |
2024-12-02 |
2024-12-06 |
Istanbul |
135 |
Fundamentals of Chemical Engineering |
2024-12-02 |
2024-12-06 |
Kuala Lumpur |
488 |
Shutdowns, Turnarounds and Outages |
2024-12-02 |
2024-12-06 |
Singapore |
644 |
Safe Isolation of Plant and Equipment |
2024-12-02 |
2024-12-06 |
Vienna |
511 |
Process & Mechanical Engineering Essentials |
2024-12-02 |
2024-12-13 |
Berlin |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-12-02 |
2024-12-13 |
Bangkok |
641 |
Process Equipment & Piping Systems |
2024-12-02 |
2024-12-06 |
Geneva |
547 |
Servo Motor Technology |
2024-12-02 |
2024-12-06 |
Amsterdam |
737 |
ISO 17025 Laboratory Quality Management |
2024-12-02 |
2024-12-06 |
Jakarta |
793 |
Chemical Handling Awareness |
2024-12-02 |
2024-12-06 |
Kuala Lumpur |
139 |
Fluid Flow Control in the Process Industry |
2024-12-08 |
2024-12-12 |
Doha |
142 |
Welding Technology |
2024-12-08 |
2024-12-12 |
Casablanca |
125 |
Mechanical Equipment |
2024-12-08 |
2024-12-12 |
DUBAI |
488 |
Shutdowns, Turnarounds and Outages |
2024-12-08 |
2024-12-12 |
Kuwait |
119 |
Fundamentals of Mechanical Technology |
2024-12-08 |
2024-12-12 |
Kuwait |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-12-08 |
2024-12-12 |
Marrakesh |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-12-08 |
2024-12-12 |
Beirut |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-12-08 |
2024-12-12 |
Cairo |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-12-08 |
2024-12-12 |
Sharm ElShaikh |
361 |
Advanced Vibration Analysis |
2024-12-08 |
2024-12-12 |
Jeddah |
364 |
Flow Measurement and Custody Transfer |
2024-12-08 |
2024-12-12 |
Manama |
135 |
Fundamentals of Chemical Engineering |
2024-12-08 |
2024-12-12 |
Amman |
345 |
Production Chemistry – OGPC |
2024-12-08 |
2024-12-12 |
Riyadh |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-12-08 |
2024-12-19 |
Muscat |
737 |
ISO 17025 Laboratory Quality Management |
2024-12-08 |
2024-12-12 |
Tunisia |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-12-08 |
2024-12-12 |
Khobar |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-12-09 |
2024-12-13 |
Amsterdam |
547 |
Servo Motor Technology |
2024-12-09 |
2024-12-13 |
Bangkok |
567 |
Process Engineering Essentials |
2024-12-09 |
2024-12-13 |
Geneva |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-12-09 |
2024-12-13 |
London |
541 |
Root Cause Failure Analysis |
2024-12-09 |
2024-12-13 |
Beijing |
486 |
Process Plant Start_up and Commissioning |
2024-12-09 |
2024-12-13 |
Singapore |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-12-09 |
2024-12-13 |
Barcelona |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-12-09 |
2024-12-13 |
Zurich |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-12-09 |
2024-12-13 |
Trabzon |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-12-09 |
2024-12-13 |
Toronto |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-12-09 |
2024-12-13 |
Prague |
644 |
Safe Isolation of Plant and Equipment |
2024-12-09 |
2024-12-13 |
Munich |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-12-09 |
2024-12-13 |
Berlin |
511 |
Process & Mechanical Engineering Essentials |
2024-12-09 |
2024-12-20 |
Brussels |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-12-09 |
2024-12-13 |
Istanbul |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-12-09 |
2024-12-13 |
Kuala Lumpur |
641 |
Process Equipment & Piping Systems |
2024-12-09 |
2024-12-13 |
Vienna |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-12-09 |
2024-12-13 |
Marbella |
547 |
Servo Motor Technology |
2024-12-15 |
2024-12-19 |
Muscat |
486 |
Process Plant Start_up and Commissioning |
2024-12-15 |
2024-12-19 |
Kuwait |
119 |
Fundamentals of Mechanical Technology |
2024-12-15 |
2024-12-19 |
DUBAI |
135 |
Fundamentals of Chemical Engineering |
2024-12-15 |
2024-12-19 |
Marrakesh |
139 |
Fluid Flow Control in the Process Industry |
2024-12-15 |
2024-12-19 |
Casablanca |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-12-15 |
2024-12-19 |
Cairo |
142 |
Welding Technology |
2024-12-15 |
2024-12-19 |
Riyadh |
364 |
Flow Measurement and Custody Transfer |
2024-12-15 |
2024-12-19 |
Beirut |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-12-15 |
2024-12-19 |
Sharm ElShaikh |
361 |
Advanced Vibration Analysis |
2024-12-15 |
2024-12-19 |
Manama |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-12-15 |
2024-12-19 |
Jeddah |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-12-15 |
2024-12-19 |
Doha |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-12-15 |
2024-12-19 |
Amman |
142 |
Welding Technology |
2024-12-15 |
2024-12-19 |
Khobar |
793 |
Chemical Handling Awareness |
2024-12-15 |
2024-12-19 |
Riyadh |
125 |
Mechanical Equipment |
2024-12-16 |
2024-12-20 |
Kuala Lumpur |
488 |
Shutdowns, Turnarounds and Outages |
2024-12-16 |
2024-12-20 |
Berlin |
541 |
Root Cause Failure Analysis |
2024-12-16 |
2024-12-20 |
Amsterdam |
567 |
Process Engineering Essentials |
2024-12-16 |
2024-12-20 |
Vienna |
345 |
Production Chemistry – OGPC |
2024-12-16 |
2024-12-20 |
Istanbul |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-12-16 |
2024-12-20 |
Bangkok |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-12-16 |
2024-12-20 |
Geneva |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-12-16 |
2024-12-20 |
Singapore |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-12-16 |
2024-12-20 |
Trabzon |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-12-16 |
2024-12-20 |
Beijing |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-12-16 |
2024-12-20 |
London |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-12-16 |
2024-12-20 |
Barcelona |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-12-16 |
2024-12-20 |
Rome |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-12-16 |
2024-12-27 |
Toronto |
644 |
Safe Isolation of Plant and Equipment |
2024-12-16 |
2024-12-20 |
Prague |
511 |
Process & Mechanical Engineering Essentials |
2024-12-16 |
2024-12-27 |
Zurich |
641 |
Process Equipment & Piping Systems |
2024-12-16 |
2024-12-20 |
Munich |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-12-16 |
2024-12-20 |
Brussels |
737 |
ISO 17025 Laboratory Quality Management |
2024-12-16 |
2024-12-20 |
Marbella |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-12-16 |
2024-12-20 |
Paris |
345 |
Production Chemistry – OGPC |
2024-12-22 |
2024-12-26 |
Jeddah |
139 |
Fluid Flow Control in the Process Industry |
2024-12-22 |
2024-12-26 |
Riyadh |
125 |
Mechanical Equipment |
2024-12-22 |
2024-12-26 |
Amman |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-12-22 |
2024-12-26 |
Muscat |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-12-22 |
2024-12-26 |
Kuwait |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-12-22 |
2024-12-26 |
Doha |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-12-22 |
2024-12-26 |
Casablanca |
361 |
Advanced Vibration Analysis |
2024-12-22 |
2024-12-26 |
Beirut |
135 |
Fundamentals of Chemical Engineering |
2024-12-22 |
2024-12-26 |
Sharm ElShaikh |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-12-22 |
2024-12-26 |
Marrakesh |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-12-22 |
2024-12-26 |
Manama |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-12-22 |
2024-12-26 |
Cairo |
142 |
Welding Technology |
2024-12-23 |
2024-12-27 |
Istanbul |
488 |
Shutdowns, Turnarounds and Outages |
2024-12-23 |
2024-12-27 |
Brussels |
547 |
Servo Motor Technology |
2024-12-23 |
2024-12-27 |
Toronto |
567 |
Process Engineering Essentials |
2024-12-23 |
2024-12-27 |
Munich |
486 |
Process Plant Start_up and Commissioning |
2024-12-23 |
2024-12-27 |
Berlin |
119 |
Fundamentals of Mechanical Technology |
2024-12-23 |
2024-12-27 |
Kuala Lumpur |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-12-23 |
2024-12-27 |
Vienna |
541 |
Root Cause Failure Analysis |
2024-12-23 |
2024-12-27 |
Bangkok |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-12-23 |
2024-12-27 |
Geneva |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-12-23 |
2025-01-03 |
Barcelona |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-12-23 |
2024-12-27 |
Amsterdam |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-12-23 |
2024-12-27 |
Beijing |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-12-23 |
2024-12-27 |
London |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-12-23 |
2024-12-27 |
Jakarta |
511 |
Process & Mechanical Engineering Essentials |
2024-12-23 |
2025-01-03 |
Trabzon |
644 |
Safe Isolation of Plant and Equipment |
2024-12-23 |
2024-12-27 |
Rome |
641 |
Process Equipment & Piping Systems |
2024-12-23 |
2024-12-27 |
Prague |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-12-23 |
2024-12-27 |
Zurich |
364 |
Flow Measurement and Custody Transfer |
2024-12-23 |
2024-12-27 |
Singapore |
737 |
ISO 17025 Laboratory Quality Management |
2024-12-23 |
2024-12-27 |
Paris |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-12-23 |
2024-12-27 |
Madrid |
142 |
Welding Technology |
2024-12-29 |
2025-01-02 |
Riyadh |
360 |
Data Analysis Techniques for Engineers & Technologists |
2024-12-29 |
2025-01-02 |
Jeddah |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2024-12-29 |
2025-01-02 |
Amman |
547 |
Servo Motor Technology |
2024-12-29 |
2025-01-02 |
Muscat |
486 |
Process Plant Start_up and Commissioning |
2024-12-29 |
2025-01-02 |
Kuwait |
119 |
Fundamentals of Mechanical Technology |
2024-12-29 |
2025-01-02 |
DUBAI |
139 |
Fluid Flow Control in the Process Industry |
2024-12-29 |
2025-01-02 |
Casablanca |
135 |
Fundamentals of Chemical Engineering |
2024-12-29 |
2025-01-02 |
Marrakesh |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2024-12-29 |
2025-01-02 |
Doha |
364 |
Flow Measurement and Custody Transfer |
2024-12-29 |
2025-01-02 |
Beirut |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2024-12-29 |
2025-01-02 |
Sharm ElShaikh |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2024-12-29 |
2025-01-02 |
Cairo |
361 |
Advanced Vibration Analysis |
2024-12-29 |
2025-01-02 |
Manama |
345 |
Production Chemistry – OGPC |
2024-12-30 |
2025-01-03 |
Istanbul |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2024-12-30 |
2025-01-03 |
Brussels |
551 |
Chemical Engineering for Non_Chemical Engineers |
2024-12-30 |
2025-01-10 |
Toronto |
641 |
Process Equipment & Piping Systems |
2024-12-30 |
2025-01-03 |
Munich |
488 |
Shutdowns, Turnarounds and Outages |
2024-12-30 |
2025-01-03 |
Berlin |
125 |
Mechanical Equipment |
2024-12-30 |
2025-01-03 |
Kuala Lumpur |
567 |
Process Engineering Essentials |
2024-12-30 |
2025-01-03 |
Vienna |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2024-12-30 |
2025-01-03 |
Barcelona |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2024-12-30 |
2025-01-03 |
Bangkok |
541 |
Root Cause Failure Analysis |
2024-12-30 |
2025-01-03 |
Amsterdam |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2024-12-30 |
2025-01-03 |
Geneva |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2024-12-30 |
2025-01-03 |
Beijing |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2024-12-30 |
2025-01-03 |
London |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2024-12-30 |
2025-01-03 |
Trabzon |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2024-12-30 |
2025-01-03 |
Rome |
644 |
Safe Isolation of Plant and Equipment |
2024-12-30 |
2025-01-03 |
Prague |
511 |
Process & Mechanical Engineering Essentials |
2024-12-30 |
2025-01-10 |
Zurich |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2024-12-30 |
2025-01-03 |
Singapore |
737 |
ISO 17025 Laboratory Quality Management |
2024-12-30 |
2025-01-03 |
Marbella |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2024-12-30 |
2025-01-03 |
Paris |
793 |
Chemical Handling Awareness |
2024-12-30 |
2025-01-03 |
Jakarta |
360 |
Data Analysis Techniques for Engineers & Technologists |
2025-01-05 |
2025-01-09 |
Manama |
136 |
Heat Transfer: Augmentation Techniques in the Process Industry |
2025-01-05 |
2025-01-09 |
Doha |
125 |
Mechanical Equipment |
2025-01-05 |
2025-01-09 |
Amman |
545 |
Process Plant Troubleshooting & Engineering Problem Solving |
2025-01-05 |
2025-01-09 |
Muscat |
139 |
Fluid Flow Control in the Process Industry |
2025-01-05 |
2025-01-09 |
Riyadh |
467 |
Design, Inspection, Repair And Maintenance Concrete Structure In Petrochemical Plants |
2025-01-05 |
2025-01-09 |
Kuwait |
138 |
Transport of Solids: Hydraulic & Pneumatic Conveying |
2025-01-05 |
2025-01-09 |
Casablanca |
361 |
Advanced Vibration Analysis |
2025-01-05 |
2025-01-09 |
Beirut |
135 |
Fundamentals of Chemical Engineering |
2025-01-05 |
2025-01-09 |
Sharm ElShaikh |
555 |
Welding Technology: Welding, Fabrication and Inspection (AWS, ASME and API Codes) |
2025-01-05 |
2025-01-09 |
Cairo |
133 |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
2025-01-05 |
2025-01-09 |
Marrakesh |
345 |
Production Chemistry – OGPC |
2025-01-05 |
2025-01-09 |
Jeddah |
737 |
ISO 17025 Laboratory Quality Management |
2025-01-05 |
2025-01-09 |
Khobar |
364 |
Flow Measurement and Custody Transfer |
2025-01-06 |
2025-01-10 |
Singapore |
503 |
Fundamentals of Chemical Engineering Process Plant Start_up and Commissioning |
2025-01-06 |
2025-01-10 |
Zurich |
641 |
Process Equipment & Piping Systems |
2025-01-06 |
2025-01-10 |
Prague |
551 |
Chemical Engineering for Non_Chemical Engineers |
2025-01-06 |
2025-01-17 |
Barcelona |
488 |
Shutdowns, Turnarounds and Outages |
2025-01-06 |
2025-01-10 |
Brussels |
547 |
Servo Motor Technology |
2025-01-06 |
2025-01-10 |
Toronto |
567 |
Process Engineering Essentials |
2025-01-06 |
2025-01-10 |
Munich |
486 |
Process Plant Start_up and Commissioning |
2025-01-06 |
2025-01-10 |
Berlin |
119 |
Fundamentals of Mechanical Technology |
2025-01-06 |
2025-01-10 |
Kuala Lumpur |
560 |
Instrumentation Engineering Practices for Facilities Personnel |
2025-01-06 |
2025-01-10 |
Vienna |
142 |
Welding Technology |
2025-01-06 |
2025-01-10 |
Istanbul |
541 |
Root Cause Failure Analysis |
2025-01-06 |
2025-01-10 |
Bangkok |
559 |
LV_MV_HV Circuit Breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
2025-01-06 |
2025-01-10 |
Geneva |
511 |
Process & Mechanical Engineering Essentials |
2025-01-06 |
2025-01-17 |
Trabzon |
553 |
Process Instrumentation: Process Control & Loop Tuning |
2025-01-06 |
2025-01-10 |
London |
540 |
Risk Based Strategies for Inspection & Maintenance (RBI & RBM) |
2025-01-06 |
2025-01-10 |
Amsterdam |
722 |
Chemical Laboratory Instrumentation: Operation, Quality and Safety of Equipment |
2025-01-06 |
2025-01-10 |
Jakarta |
515 |
Advanced HVAC Design, Maintenance & Operation Techniques |
2025-01-06 |
2025-01-10 |
Beijing |
644 |
Safe Isolation of Plant and Equipment |
2025-01-06 |
2025-01-10 |
Rome |
737 |
ISO 17025 Laboratory Quality Management |
2025-01-06 |
2025-01-10 |
Paris |
738 |
ISO IEC 17025 ~ 2017 Testing and Calibration Laboratories |
2025-01-06 |
2025-01-10 |
Madrid |
793 |
Chemical Handling Awareness |
2025-01-06 |
2025-01-10 |
Madrid |